09-24-2015, 04:12 AM
'Palm' pid='63041' datel Wrote:Ant S def is 2016 event and then those other 3 prospects in PRL15 that there is great excitement about. Chances are Ant 6 will be the last well drilled in 2015 as Ant7 has been pushed back to be a post-Cert most likely and Ant 6 and prob Rapter will both likely be 2016 spuds. Conserve cash and get Certification rolling.
You are welcome to that opinion on Ant 7, but I see no indication anywhere that it will be a post-cert or pre-cert. I think it is still under consideration and depends on the potential certification effect and not affecting FID. I also think Ant 6 will be a 2015 spud if things go okay as planned at Ant 4.

