'Getitrt2' pid='63075' datel Wrote:
'Palm' pid='63041' datel Wrote:Ant S def is 2016 event and then those other 3 prospects in PRL15 that there is great excitement about. Chances are Ant 6 will be the last well drilled in 2015 as Ant7 has been pushed back to be a post-Cert most likely and Ant 6 and prob Rapter will both likely be 2016 spuds. Conserve cash and get Certification rolling.You are welcome to that opinion on Ant 7, but I see no indication anywhere that it will be a post-cert or pre-cert. I think it is still under consideration and depends on the potential certification effect and not affecting FID. I also think Ant 6 will be a 2015 spud if things go okay as planned at Ant 4.
You are also welcome to that opinion, but slide 35 of Operator Total's presentation states "Antelope South well in 2016". Nothing about it depending on Ant 4 going "as planned". AnT 7 is being discussed and in the light of of whether it will be pre-cert or post-cert with the priority on not pushing back Certification. Discussions are that it will get paid for eventually. With what is being seen as far as "molecules" presently it's likely GLJ amounts will be met or exceeded. No need to stress cash. Horse's mouth.

