09-24-2015, 08:17 AM
Per SPA they can't delay FID for drilling results . Fact without Ant 6 they have enough gas to sanction a 2 train plant . Why even drill 6?..but it could happen this way drill 6 then drill 7 at same time working on certification so no delay .If UBS is right with a 9.5 T P-1 number now then a P-2 number would be even higher . Or 10 T gets us cooking on a build .