01-18-2012, 07:41 AM
I was thinking about that too. Well, more when then where. I went back to your previous postings on T-2, then went to Ant-2 drilling.
http://interoil.com/upload/pdfs/2009-08-...final_.pdf
On July 27,2009 spudding occurred... on Aug 24th they had successfully set 13 3/8 casing all the way down to 3,609 feet.
So, if your thinking indications of gas @ 3117 feet, we should get those indications within 30-45 days assuming a drill rate near ANT-2.
http://interoil.com/upload/pdfs/2009-08-...final_.pdf
On July 27,2009 spudding occurred... on Aug 24th they had successfully set 13 3/8 casing all the way down to 3,609 feet.
So, if your thinking indications of gas @ 3117 feet, we should get those indications within 30-45 days assuming a drill rate near ANT-2.