I am sure you are aware that Total is now the operator of PRL 15.
There is a level of care that must be taken when drilling into such a powerful reservoir as Antelope. Care must be taken to make sure the cement job is as good as possible before drilling ahead and that is exactly what the operator is doing. Cementing issues are not uncommon in drilling.
The focus by the JV (including Total) on PRL 15 with two rigs working is a good outcome. By these means a rig can mobilise to A-6 without having to wait for A-4 ST1.