11-17-2015, 01:46 AM
Positive results from A7 could impact the decisions regarding the size of the trains at Papua LNG. Larger trains initially will provide a basic cost savings per mmtpa once operational..Thus basis of design and FID decisions could hinge on A7 results, if the JV decides to proceed with its drilling.

