Thread Rating:
  • 1 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Drilling update from OSH
#4
Actually in reading the Nov 13 presentation they have reached objectives with Ant 4:

"Well at total depth
• Primary objective: establish vertical extent of high- quality reservoir in Antelope-4
• Antelope-4 core analysis supports high-quality reservoir porosity and permeability in southern flank of field
• Well intersected top reservoir at 1,875m (6,152ft) TVDSS, 340m (1,115 feet) above field-wide gas- water contact
• Well at total depth of 2,262m (7,421ft) TVDSS - 48m (157ft) below the field gas water contact
• Wireline logging is now in progress as planned"

Just for once would be nice for IOC to report a status update, especially since Ant 4 took way longer than originally expected.
Reply



Messages In This Thread
Drilling update from OSH - by Gator - 12-03-2015, 11:19 PM
RE: Drilling update from OSH - by Palm - 12-03-2015, 11:38 PM
RE: Drilling update from OSH - by Stavros - 12-04-2015, 12:01 AM
RE: Drilling update from OSH - by Palm - 12-04-2015, 12:57 AM
RE: Drilling update from OSH - by Getitrt2 - 12-04-2015, 01:37 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)