Thread Rating:
  • 1 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Low-cost LNG drives InterOil
#9
Justin the talk about PRL-15 is they will start with 2 trains the size of those trains to be determined by the Basis Of Design study . If you believe 10 T's that could be 3 trains from E/A depending on the size of the first 2 trains . Many think 12 T's . Who will develop the non PRL-15 gas is a very current valid question .
Reply



Messages In This Thread
Low-cost LNG drives InterOil - by Justin94360 - 12-18-2015, 07:58 PM
RE: Low-cost LNG drives InterOil - by Justin94360 - 12-18-2015, 08:03 PM
RE: Low-cost LNG drives InterOil - by jft310 - 12-18-2015, 10:40 PM
RE: Low-cost LNG drives InterOil - by Tusker - 12-19-2015, 12:53 AM
RE: Low-cost LNG drives InterOil - by Thylacine-2 - 12-19-2015, 01:52 AM
RE: Low-cost LNG drives InterOil - by sageo - 12-19-2015, 04:35 AM
RE: Low-cost LNG drives InterOil - by Putncalls - 12-19-2015, 02:36 AM
RE: Low-cost LNG drives InterOil - by jft310 - 12-19-2015, 11:58 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)