Thread Rating:
  • 1 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Antelope-6 drilling under way
#13

'Justin94360' pid='65502' datel Wrote:

Antelope-6 drilling under way Singapore and Port Moresby, December 24, 2015: InterOil Corporation (NYSE: IOC; POMSoX: IOC) has been advised by Total E&P PNG Limited, operator of Petroleum Retention License 15 in the Gulf Province of Papua New Guinea, that it has begun drilling the Antelope-6 appraisal well. The well is designed to provide structural control and reservoir definition on the field’s eastern flank. It has a proposed total depth of around 2,464 meters (8,084 feet) true vertical depth sub-sea and is located about 2km east-south-east of Antelope-3. InterOil holds a 36.5375% interest in the well. Total E&P PNG Limited has a 40.1275% interest, Oil Search has 22.8350%, and the remaining 0.5000% is held by minority parties.

I would have thought that the spud announcement would have been announced on Dec 31st. THis would have been the minimum effort I have become accustomed to. Go IOC /Total-you outperformed my expectations.

Reply



Messages In This Thread
Antelope-6 drilling under way - by Justin94360 - 12-24-2015, 05:09 PM
RE: Antelope-6 drilling under way - by Stavros - 12-24-2015, 05:40 PM
RE: Antelope-6 drilling under way - by ArtM72 - 12-24-2015, 11:04 PM
RE: Antelope-6 drilling under way - by jft310 - 12-24-2015, 11:17 PM
RE: Antelope-6 drilling under way - by petrengr1 - 12-25-2015, 12:59 AM
RE: Antelope-6 drilling under way - by petrengr1 - 12-25-2015, 01:01 AM
RE: Antelope-6 drilling under way - by Kaliboo - 12-25-2015, 01:18 AM
RE: Antelope-6 drilling under way - by sageo - 12-25-2015, 01:21 AM
RE: Antelope-6 drilling under way - by Stavros - 12-25-2015, 01:37 AM
RE: Antelope-6 drilling under way - by petrengr1 - 12-25-2015, 02:18 AM
RE: Antelope-6 drilling under way - by petrengr1 - 12-25-2015, 02:18 AM
RE: Antelope-6 drilling under way - by petrengr1 - 12-25-2015, 05:51 AM
RE: Antelope-6 drilling under way - by wapitidropiti - 12-25-2015, 03:17 AM
RE: Antelope-6 drilling under way - by Putncalls - 12-25-2015, 04:41 AM
RE: Antelope-6 drilling under way - by petrengr1 - 12-25-2015, 05:58 AM
RE: Antelope-6 drilling under way - by Stavros - 12-25-2015, 10:18 AM
RE: Antelope-6 drilling under way - by Stavros - 12-25-2015, 11:32 AM
RE: Antelope-6 drilling under way - by sageo - 12-26-2015, 02:06 AM
RE: Antelope-6 drilling under way - by sageo - 12-28-2015, 06:01 AM
RE: Antelope-6 drilling under way - by jft310 - 12-28-2015, 08:21 AM
RE: Antelope-6 drilling under way - by ArtM72 - 12-28-2015, 10:46 PM
RE: Antelope-6 drilling under way - by Kaliboo - 12-29-2015, 02:08 AM
RE: Antelope-6 drilling under way - by ArtM72 - 12-29-2015, 03:02 AM
RE: Antelope-6 drilling under way - by jft310 - 12-29-2015, 02:22 AM
RE: Antelope-6 drilling under way - by jft310 - 12-30-2015, 12:29 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)