'Kaliboo' pid='65551' datel Wrote:
I think we know the minimum is two trains but are these standard trains or "super sized trains." My guess is the challenge with this project is expansion optionalities. You want to be able to add trains quickly without much disruption to production and at a highly attractive cost. There are many variables that can come into consideration especially if you consider other gas sources than E//A. Adding functional optionalities adds cost upfront and takes more time, but can potentially add huge benefits later, dramatically boosting profitability. The danger is getting bogged down aiming for the "best" solution. I've seen companies fall in that trap multiple times on large oil and gas fields. Every time I can recall the resulting delay was very harmful to economics due to a changing oil price environment. Companies where decision making relies too much on consensus and team decision making are more prone to this situation. So far it seems this group is leaning in that direction.
That's why I believe if anything significant is happening on the LNG and CSP facility designs they must have already selected a unit size due to the different footprints of the 3.5 and 5.0 MTPA (or other) alternatives. Hession and his tribe might be fighting hard beating every last nickel out of contractors and suppliers. IF the JV is in fact working hard to get the deals done while prices are low that's ok so long as the"good deal" is not sacrificed in pursuit of the "perfect deal". It is the talk of A7 that causes me to worry about pursuit of the perfect resource payment.
On the other hand, if there is a substantial technical question related to the resource payment that somehow might require A7 be drilled then A7 should be drilled. That's why I posited the question of how does one define the magnitude of the water drive prior to actual production? In any event given the very material nature of resource payment and its timing we should be kept much better informed by our corporate staff.