01-05-2016, 06:54 AM
"The well reached the planned original total depth (TD) of 4810 m, referenced from the rig
rotary table. Following drilling, wireline logging was conducted and confirmed the presence of
a gas column through pressure measurements and gas sampling. The well was subsequently deepened to a final TD of 5306 m.
The well was spudded on 27 November, reached its original target on 23 December and
wireline logging concluded on 29 December."
Nice production rate.
rotary table. Following drilling, wireline logging was conducted and confirmed the presence of
a gas column through pressure measurements and gas sampling. The well was subsequently deepened to a final TD of 5306 m.
The well was spudded on 27 November, reached its original target on 23 December and
wireline logging concluded on 29 December."
Nice production rate.