(01-15-2016, 07:52 AM)Getitrt2 Wrote: IOC has NOT "shut down" its entire "drilling program". They have given top priority for resources for the time being, including available rigs and cash, to participating in and paying their share of drilling in PRL 15, including Antelope 6 now drilling with HA Rig 115, a possible Antelope 7 with potential huge additional cash returns, and Antelope South, for which the other high-quality rig, HA 116, might be used. Also, there are indications that negotiations may be going on for monetization of Triceratops, Raptor, and/or Bobcat, which could include "carry" funding for additional drilling in those discoveries. In the meantime, further survey and seismic work and analysis on those discoveries and other exploration prospects is being funded and going on. I think a final decision on Ant 7 would need to precede any comments on how they will proceed with and after that. On Wahoo, I don't know whether they have further information, or if so, perhaps it is not currently material and proprietary information they do not want to disclose.
IOC had three drilling rigs when Hession came in and two under contract with High Arctic. One High Arctic rig was sublet to Total. The remaining four rigs are not in service. (for arguments' sake, yes, one was junk, one is brand new and the remaining two have rin the past few years had significant restoration work done). We know nothing of Antelope 7 activities and Antelope South, once a priority, has fallen off the radar completely so they aren't being mobilized for used for PRL15. They are waiting for??? We don't even have any sites identified for drilling so we have no reason to suspect there is even any preliminary site preparation going on.
Sure, we all have to expect T, R & B negotiations are ongoing but it is a difficult commercial market as a lot of smart money would rather buy known assets from bankruptcy courts than pay for appraisal wells. So I reiterate. IOC needs to get paid by Total so IOC can get back to its knitting. Of course IOC is sitting on nearly a half billion in liquidity that it could be using in the interim but it's not.
On the survey end CGG was given a contract late in 2014 for a 37,000 km aerial survey. That work, which also included seismics was due to be finished in August 2015 (http://www.rigzone.com/news/oil_gas/a/13...cts_in_PNG). Has anyone heard anything about new studies since then? As far as we know unless IOC has its own crews out beating the jungle survey field work has come to a complete halt as well as the drilling.
Oh. Wahoo. We were only told they didn't find a carbonate reservoir. They found something but refuse to say what it was. We do know Wahoo 1 was shut down due to excessive gas pressure. Lots of gas is extracted from sandstone around the world. I suppose if you find gas and sandstone but choose not to investigate it can be considered immaterial.
No drilling. No LNG facility design responsibilities. No LNG marketing responsibilities. No site preparation. No active geologic field studies. What the hell is going on other than a hemmorrage of executive salaries and stock options.