02-24-2016, 03:04 AM
'petrengr1' pid='66939' datel Wrote:On Antelope 6 we've just taken our fourth core in the reservoir and we're doing an intermediate logging run. We'll test on the way down and then we'll drill out through the reservoir and do a longer term test and also an injectivity test as well.
I think once we've got all that data over the next sort of two, three, four weeks I think we're going to have a very good, a good feel for the resource base and all of that data is and will be provided to our certifiers.
Pet - Thanks much for that info .

