07-30-2016, 05:17 AM
Suppose we say no to XOM they will remain interested in E/A and the leases of IOC. The P'Nyang field is a failure till now and the development cost are very high in the mountains. XOM wants to build train 3 and needs the feedstock from IOC. So, I am sure we can wait with the deal till after certification or even FID. It is a good sign that Total is so determined to build Papua LNG. May be they prefer XOM. However, they decided to team up with IOC in 2014.