'Gator' pid='63912' datel Wrote:
'2126' pid='63910' datel Wrote:Some of the 'bad news' press releases in the last year:
IOC Discovery at Raptor 1 (11/14)
IOC Discovery at Bobcat 1 (12/14)
OSH Arbitration Claim Dismissed (2/15)
E/A Joint Venture Selects Sites (7/15)
Total Assumes Operatorship of E/A (7/15)
Antelope 5 Results Suggest High Quality Reef Extends West (8/15)
Antelope 4 Side Track 1 Spud (8/15)
Successful Flow Test at Triceratops 3 (9/15)
Second Rig Joins E/A Appraisal Work (10/15)All that and $39 will get you a share of IOC stock (which is down over 50% from the transformation deal.)
Most everything on that list is not important. The only thing that matters is certification payment; When and How much. Neither of which can be answered 23 months after the deal.
You even list "OSH Arbitration Claim Dismissed (2/15)". Arbitration and the delay that followed should never have happened.
You also list "Side Track 1 Spud" that is because there was a delay and "Second Rig Joins E/A" which is also the direct result of a delay.
Delays matter.
The JV did not decide to drill the Ant 4 sidetrack "because there was a delay', but rather because of the excellent results and additional opportunity revealed by Ant 4 in spite of the delays from a bad rig that had to be used but is no longer in use. Good management makes appropriate changes as the facts and environent change, and decisions have been being made in coordination with Total.