Thread Rating:
  • 1 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
What are these pre-emptive rights??
#41

'admin' pid='40435' datel Wrote:Thanks for that enlightening expose and welcome aboard, eyeowecee.

I think you nailed it.

Reply

#42
The way I see it "the real problem is" that PNG LNG does not have enough gas to expand. IOC and Total went ahead and made a deal to build their own plant. PNG LNG partners do not like this idea because they do not have the gas they need. Not for a while. With a gulf plant in the works, there will be no gas diverted to PNG LNG. OSH/XOM don't like that threat. It will cost them tens of billions of dollars over the years.

So syd. Your riddle is that Exxon and Total is hammering this out. That is my take. What is the solution?
Reply

#43

'cybersssss' pid='40709' datel Wrote:The way I see it "the real problem is" that PNG LNG does not have enough gas to expand. IOC and Total went ahead and made a deal to build their own plant. PNG LNG partners do not like this idea because they do not have the gas they need. Not for a while. With a gulf plant in the works, there will be no gas diverted to PNG LNG. OSH/XOM don't like that threat. It will cost them tens of billions of dollars over the years. So syd. Your riddle is that Exxon and Total is hammering this out. That is my take. What is the solution?

$2.50/dry mcf fob Kerema?

Reply

#44

'cybersssss' pid='40709' dateline='<a href="tel:1396318 Wrote:The way I see it "the real problem is" that PNG LNG does not have enough gas to expand. IOC and Total went ahead and made a deal to build their own plant. PNG LNG partners do not like this idea because they do not have the gas they need. Not for a while. With a gulf plant in the works, there will be no gas diverted to PNG LNG. OSH/XOM don't like that threat. It will cost them tens of billions of dollars over the years. So syd. Your riddle is that Exxon and Total is hammering this out. That is my take. What is the solution?

And IOC's gas is so strategically located. Couple of other interesting things. OSH/Botten clearly stated that the GCA has a midpoint of 7.1Ts, but he was acknowledging 5 Ts. Huh not quite enough for justification of a new plant. Then today IOC's info repeats the GCA 7.1 Ts. A little more chess played. Then last week I asked why it was that IOC said that when they spud Bobcat they would release results when they were final. Pretty unusual. Unless you want OSH/XOM knowing as little as possible. What a game!

Reply

#45

'Palm' pid='40711' datel Wrote:

'cybersssss' pid='40709' dateline='<a href="tel:1396318 Wrote:The way I see it "the real problem is" that PNG LNG does not have enough gas to expand. IOC and Total went ahead and made a deal to build their own plant. PNG LNG partners do not like this idea because they do not have the gas they need. Not for a while. With a gulf plant in the works, there will be no gas diverted to PNG LNG. OSH/XOM don't like that threat. It will cost them tens of billions of dollars over the years. So syd. Your riddle is that Exxon and Total is hammering this out. That is my take. What is the solution?

And IOC's gas is so strategically located. Couple of other interesting things. OSH/Botten clearly stated that the GCA has a midpoint of 7.1Ts, but he was acknowledging 5 Ts. Huh not quite enough for justification of a new plant. Then today IOC's info repeats the GCA 7.1 Ts. A little more chess played. Then last week I asked why it was that IOC said that when they spud Bobcat they would release results when they were final. Pretty unusual. Unless you want OSH/XOM knowing as little as possible. What a game!

We have a report stating that Exxon was rebuked again in favor of Total.  We know OSH is on record as stating that they have been interested in PRL 15 for some time.  They bought out the minority interest.  They filed for their pre-emptive right.  These are all very good signs in my opinion, as this is THE MOST DESIRABLE GAS IN PNG CURRENTLY.   Not a bad position to be sitting in for IOC.

Good luck longs

Reply

#46
Excuse me JDEO1969- PRL 15 is the ONLY gas available in PNG right now. Even better position.... Smile
Reply

#47
Agree JDEO and Cyber. There likely are all kinds of wheels in motion on this and Hession is in a great spot. Not easy, but that's why he was brought in.

To expand on some of how this transaction was done there is another clause of interest under Seller Warranties in Schedule 1 (lots of interesting stuff in here). It not in copyable format but clauses 10 and 11 discuss the Company as a subsidiary with all title, JVOA etc rights. It also states that Seller
warrants that the shares were not issued in violation of any preemptive rights and a couple of other things. Of course if anything comes of this IOC must indemnify Total.
Reply

#48

Apologies for the riddle, but it was in the morning just before I had to dash out that I came upon that quote and things looked to fall into place and I did not have the time to structure a propper reply. Let me try to tie things together.

1) the purchase by OSH of the shares into "Pac LNG" group of companies was just one of those very luck instances that happen from time to time, it was not something planned with cunning strategy from way back in time.

2) The PNGLNG plant from the very beginning was designed for 5 LNG trains. This does not mean that it can not have more or less trains than the designed 5. It just means that since there is not an even incrament  in all components necessary tying in with the incrament count of the train number, the 5 train number is the most efficient. EG: if each storage tank because of its size was good to handle 1.25 trains, then 4 storage tanks are exactly enough for handling 5 trains of LNG. If one power generating subplant is enough for 2.5 trains, then exactly 2 subplants are exactly enough to feed 5 trains etc. Remember most part are usually made to some sort of incramental size standard, so you never actually get an even, 1 power generater to 1 storage tank, to 1 LNG compressor etc. This 5 train initial design comes from way back at the start of the project, and the idea was to expand and increase ROI as more trains were added with a starting point of 2 trains.

3)Contarary to what many people have wittingly posted about there not being enough gas for a third train, you are correct it is not a proven resource, but the probability is very high that there will be enough gas proven by the end of this year for the third LNG train.

4) the pipeline coming down to the PNGLNG plant appears to be large enough to carry at least enough gas for 3 trains. Any more gas trains should require another pipeline. To create another pipeline, it is much more efficient to have it to carry enough gas for 2 trains than for 1 train.

5) there is also a high confidence that the PRL15 field will have at least if not more gas resources proven over the future to easily feed 2 LNG trains.

With the fortunate opportunity that OSH found itself in with the ability to purchase "Pac LNG" group of companies, the gears started turning. Build out PNGLNG with the most efficient 5 train format. PNGLNG partners should have enough gas and pipeline in place for 3 of the trains. Get 2 trains of gas from PRL15 with its own pipeline being able to carry that amount of gas. How can this be enacted. It will take significant time for negotiations, and some pressure if it can be applied would also be very helpful.

The problem was that IOC and Total were too close to an agreement to stop that part from happening without it causing huge disturbances for not only IOC (think what would have happened to the share price). It is to no ones advantage to have IOC bought out at this important time. OSH also  had an ace up its sleve with the pre-emption rights situation.

We now know from that quote that the attempted way around the pre-emption rights situation by IOC and Total was to just put the required PRL15 equity into an internal holding company and just sell the shares of that internal holding company. If it was just that easy, then none of the pre-emption rights from past or even present contracts for any company would be enforcable. There is another reason this was done.

By doing what IOC and TOTAL did it enabled them to continue with their agreement at the moment. By doing what IOC and TOTAL did allowed OSH to put in the challenge and thus the the pre-emption rights will not time out over time as there is now a current active dispute started. This dispute can be dragged out for as long as all parties want it to.  I also believe that OSH was genuine when it said that all that it wants is to have say in where the E/A gas gets processed. It is not necessarily a major plot to get XOM back into the deal, although this may possibly happen depending about how things develop.

This now gives IOC, TOTAL, and OSH the time to negotiate( with enough time) about how to get the extra 2 trains of gas to feed PNGLNG without causing any great market disruption for any of the partners. And the stick that OSH is wielding happens to be "If you dont play how I want you to play, then I will force you two to separate".

OSH does not necessarily want TOTAL out of the picture at all. IT just wants the gas to go a particular way.

This is why I believe the the pre-emption rights issue is not actually a dispute, it is a means to an end for something completely different. OSH does not necessarily want the share in PRL15 that TOTAL now has at all. If they can come to an appropriate understanding about the direction of the gas, then we should probably see OSH drop the pre-emption rights challenge.

I hope that makes sence to others also.

Reply

#49
Thanks syd, pretty much matches overall what we've been saying here. The subsidiary thing isn't as much a big deal as 100% of the title etc of PRL 15 has been in SPI 208 for quite some time. And thanks for the LNG plant explanation on trains/pipelines etc. Very much helps clear up the number of trains issue.
Things sound very promising for IOC shareholders. Dr Mike came along just in time it seems.
Reply

#50
Syd- I think you are correct in most parts. We would disagree on what OSH has available for a third train. Why?? At the roadshow with IOC we have public information filtered thru IOC eyes to look at. It was said there that IOC would consider selling 2.5 T's of Triceratops gas to Exxon. That's implies that Exxon thinks OSH is short gas and has approached IOC for train 3 and maybe more and needs IOC gas to build more. Reading OSH estimates has always been looking through rose colored glasses. That puts IOC in the drivers seat. They have at least 7 T's today. Exxon needs certainty, not well we hope, we think we might, from OSH, to build the 3rd train. Today OSH is short gas and Exxon can't declare FID on the third train short gas. To declare FID Exxon must cut a deal with Total. Exactly how these puzzle pieces fit is being figured out now IMHO. If Exxon delays then IOC might and most likely will find more assets which improves the odds they build their own plant and Exxon can wait years and years to see if OSH finds anything. Odds of Exxon waiting years for OSH to maybe confirm gas is not reality. Therefore reality will prevail and we get a grand compromise . Lots of ways that can play out.
Reply



Forum Jump:


Users browsing this thread: 1 Guest(s)