June 2015 Drilling Reports - Courtesy of OSH
#1

Taza 3 - Kurdistan Iraq

Yet another miserable failure for Oil Search. Follows on the heels of previous poor results in Kurdistan AND in PNG



During the month, Taza 3 ST1 reached its total depth of 3,800 metres in a 4-1/8” hole and preparations for testing took place. Towards the end of the month, the first of three planned drill stem tests was conducted, over the Kirkuk section. The Kirkuk interval proved tight and failed to flow. During the test period, pressure declined rapidly and test fluid with only minor traces of oil was recovered. Due to operational issues and the tightness of the interval, the test was terminated.
Preparations have commenced for the remaining two tests, over the Euphrates and Jeribe intervals, which both flowed hydrocarbons in other wells.

Antelope-5 Oil Search Rig 103


During June, a multi-rate production test of Antelope 5 was concluded successfully.

While analysis of the test results continues, the preliminary interpretation is consistent with a substantial resource base and good productivity in the carbonate reservoir.

Additional testing of Antelope 5 is planned as part of the remaining appraisal programme.

Demobilisation of Rig 103 from the Antelope 5 location and its move to Antelope 4 ST1 is now underway.

Antelope-4   Western Drilling Rig 1/Rig 103


During the month, the Western Drilling 1 rig was demobilised and preparations took place to sidetrack Antelope 4 using Oil Search’s Rig 103, which is presently being mobilised to site.

The sidetrack is planned to be drilled to a total depth of approximately 2,378 metres.

Drilling of the sidetrack is expected to commence during the third quarter of 2015.



Attached Files
.pdf   Oil Search Drilling Report for June-2015.pdf (Size: 191.66 KB / Downloads: 12)