Output vs Regas Mismatch Looming
#11

This year, Pakistan, Egypt, Jordan and Uruguay plan to begin importing natural gas via floating storage and regasification unit (FSRU) vessels. The vessels are a solution to the challenge of importing liquefied natural gas (LNG) into areas that lack sufficient transfer and regasification terminals onshore. These vessels provide solutions for small-market gas demand regions and as temporary solutions for where future onshore regasification facilities are planned.

The PGN FSRU Lampung. From Hoegh LNG.

The FSRU vessels are capable of transporting and storing LNG, and then regasifying LNG onboard to deliver volumes into offshore terminals or onshore receiving terminals. Offshore facilities typically include a buoy and connecting undersea pipelines to transport regasified LNG to shore. Onshore receiving terminals typically include large deepwater docks and takeaway pipeline infrastructure. Both types of facilities might also include gas processing equipment and natural gas liquids (NGLs) storage facilities.

According to the US Energy Information Administration, a total of 16 FSRUs serve the global market as transportation and regasification vessels. An additional five vessels, which have been converted into FSRUs from conventional LNG vessels, are permanently moored.

London-based Golar LNG owns four currently operational FSRUs, all based on conversions of LNG carriers. These are the Golar Spirit (operating in Brazil), Golar Winter (Brazil), Golar Freeze (Dubai) and Nusantara (Indonesia). Its newbuilds include the Golar Eskimo (Jordan), Golar Igloo (Kuwait) and Golar Tundra (for Marshall Islands in November 2015).

Antwerp-based Exmar owns the FRSU Toscana (Italy) and is building its to-be-named floating regasification barge for Liberia work.

Texas-based Excelerate Energy operates the largest fleet of FSRUs in the industry. Its vessels are purpose-built LNG tankers that can vaporization LNG and discharge natural gas as a liquid at a conventional LNG receiving terminal, or as gas through the FSRU’s connection with a subsea buoy in the hull of the ship, or as gas through a high-pressure gas manifold from the vessel’s LNG loading arms. Excelerate’s fleet include its Excalibur Class, Excelsior Class, Explorer Class, Experience Class, all built by Daewoo Shipbuilding & Marine Engineering.

Already the world’s largest LNG carrier operator, Mitsui O.S.K. Lines (MOL) plans to build, own and operate an FSRU with a storage capacity of 263,000 cu m of LNG—making it the world’s largest. The vessel will be built by Daewoo Shipbuilding & Marine Engineering Co. for delivery by September 2016.

The Gdf Suez Cape Ann. From Hoegh LNG.

Norway-based Hoegh owns the PGN FSRU Lampung at a purpose-built mooring system in the Lampung Province at the southeast coast of Sumatra, Indonesia. The company also owns the GdF Suez Cape Ann that is employed as China’s first FSRU in Tianjin, China. Hoegh’s Hoegh Gallant is working as an LNG import terminal (FSRU) in Ain Sokhna, Egypt, and its Independence is working as an LNG import terminal in Klaipeda, Lithuania.

On 27 March, Pakistan received its first FSRU-sourced LNG shipment into its newly developed receiving infrastructure near Port Qasim, Karachi via Excelerate Energy’s FSRU, the Exquisite. The shipment of 147,000 cu ft of LNG from Qatar docked at Engro Corp.’s Elengy Terminal Pakistan Limited. After regasification, the gas was injected into the Sui Southern Gas pipeline for further transportation and final sale to power generators in Punjab. Later shipments will be used as compressed natural gas and as feedstock for fertilizer companies.

Meanwhile, Egypt recently suspended gas exports and seeks gas imports to feed its growing consumption demand. The country began developing plans for an offshore regasification terminal in 2012, and received its first LNG cargo in early April.

Jordan is struggling to meet its own demand after Egypt suspended pipeline exports to the country, and has since secured an FSRU vessel to be moved to offshore Aqaba, accompanied by a 500 MMcf/d regasification terminal that is scheduled to come online in May 2015.

Uruguay is building infrastructure for an offshore 400 MMcf/d regasification terminal near Montevideo, which is expected to be completed in 2016. The facility will supply its domestic market and could provide exports to Argentina. Originally planned to come online in mid-2015, the regasification terminal has been delayed until 2016.

Elsewhere, four other floating regasification terminals are planned in the next few years for Colombia, the Dominican Republic, India, and the Philippines.

However, in Colombia, Pacific Rubiales delayed its acceptance of the delivery of an Exmar FSRU, and agreed to sell approximately 43% of its interests in Pacific Midstream (which owns the ODL and Bicentenario pipelines, the Petroelectrica power transmission line, and the future LNG project), to the International Finance Corp. and a consortium of investors in December 2014. The company received $240 million in cash in December 2014 and the remaining $80 million is expected to be received sometime in 2015 upon completion of certain condition precedents and the completion and transfer of the LNG project.

Floating regasification was first deployed in the US Gulf of Mexico in 2005 and has since been employed in Argentina, Brazil, China, Indonesia, Israel, Italy, Kuwait, Lithuania, and the United Arab Emirates.

Reply

#12
Good stuff Palm - thanks.
Reply

#13
Nice work you do - thanks 2.
Reply

#14
This is how they do the conversions of LNG carriers to FSRU's. It's the Golar Nusantara. It's not very expensive to make the conversion. The reported contract price of 20 Million Singapore Dollars back in 2011 was equivalent to about US$ 16 Million.

http://www.offshoreenergytoday.com/singa...golar-lng/


Singapore: Sembcorp Secures FSRU Conversion Contract with Golar LNG

Jurong Shipyard, a wholly-owned subsidiary of Sembcorp Marine, has secured an approximately S$20 million contract from Golar LNG Energy to convert the LNG Khannur, a Liquefied Natural Gas (LNG) tanker, to a Floating Storage and Regasification Unit (FSRU) to be renamed West Java FSRU.

The 125,000-cbm LNG tanker, which arrived in Jurong Shipyard recently, will be converted into a FSRU capable of producing 500 MCFD (million cubic feet per day) of gas, with a regasification capacity of approximately 3.8 MTPA (million metric tonnes per annum).

The West Java FSRU represents Golar’s fourth FSRU project for PT Nusantara Regas, a joint venture between Pertamina and PGN. On conversion completion, the vessel will be installed 15km offshore Muara Karang, Jakarta Bay, in Indonesia, where it is contracted to operate until the end of 2022, with provision for further automatic extension options to 2025 subject to certain contract conditions.

The West Java FSRU project will be Indonesia’s first LNG regasifaction terminal and represents the first FSRU project in Asia.

The contract is not expected to have any material impact on the consolidated net tangible assets per share and earnings per share of Sembcorp Marine for the year ending December 31, 2011.
Drivel Maven with Personality
Reply

#15
FRSU's are likely a small part of the future of re-gasification. FRSU's have a big drawback - less capacity. FRSU's offer flexibility to the large LNG importers like JP and SK but they cannot supplant the efficiencies of onshore re-gas plants, where onshore pants are feasible. Notice that FRSU's are employed in small markets and difficult to access ports in those markets. Papua LNG gas will go to premium buyers in premium markets, JP, SK and CH where onshore capacity exists and will be built out.

Check out the list of re-gas projects and liquefaction which have been cancelled and suspended. Chit load of planned re-gas is dead, stalled and delayed.
Gulf LNG shown as 'cancelled' as of July, likely due to a simple name change as Gulf LNG does not exist.

http://www.globallnginfo.com/world%20lng%20plants%20&%20terminals.pdf
Reply

#16
Reality is that the LNG industry is maturing and as always this results in better, less expensive production methods and the money goes there. No need to repeat the expected low costs of Papua LNG. Total is stating it clearly. They are engineering this project to be very low cost and there's little doubt they will succeed and the LNG from the project will get purchased. That's what we care about.

We can say what we want but our LNG contracts ARE affected by oil prices. The Certification has the set price per the SPA but contracts to be done reflect oil prices. Buyers of energy fuel are not stupid and when oil spiked back up to $100 China and others shifted back to more coal and alternative energy mixes. That's documented. And it makes sense.

Coal was mandated by the US government many years ago because it was plentiful in the US and the power industry eventually engineered plants to be highly efficient and once fitted with scrubbers pollutants are greatly reduced. That's been fine until the global warming/CO2 issue came along. Now the power industry is gradually shifting to more renewables and natural gas. In Ohio people have been screaming about all the gas that's being found and coal still being burned. Guess what? Ground is being broken on new gas-fired plants as infrastructure and conditioning plants have been built. So the great shift to NG is on. Takes time.

This is happening around the world and gas is still projected to be big for electric generation. In fact last month in the US for the first time, NG for electric generation passed coal as 31% was produced by NG, 31% by coal. It's happening and NG will be the new king of generation fuels around the world. But it demands lower costs; Asia has been screaming about this for the last several years.

Papua LNG will get built and be very low cost. Contracts will be lower than those of the past but will be very profitable. Low cost dependable energy fuel will always win out.
Reply

#17
Palm, when do the contracts need to be inked? I expect oil prices to be substantially higher in six months to a year. It would be a more favorable climate for contracts when the price recovery is clearly underway.
Reply

#18
Well put Palm. I guess IOC is the ugly duckling and the oil music just stopped playing. IOC might even get the chair that the Australian players wanted.
Reply

#19

'Thylacine-2' pid='61252' dateline='<a href="tel:1438446 Wrote:Palm, when do the contracts need to be inked? I expect oil prices to be substantially higher in six months to a year. It would be a more favorable climate for contracts when the price recovery is clearly underway.

And that's why Total is saying they are in no great hurry on the contracts. They in effect have nothing to sell until they get Certification done, PDL's etc applied for/approved, and have the proposed project approved. Most of the gass will have to be contracted for FID to occur. They are saying FID in 2017, so that's a rough timeframe. Doesn't mean they aren't being approached now, but they have no reason now to enter into contracts. They need to work through this concept engineering to get the costs as low as possible. Then they have some basis for negotiating.

That was the crux of the message from Total the other day (and BTW today the are officially Operator); we will take our time and get this right, and when we do this likely will be the lowest cost project to come along.  Buyers will line up and we will have a very nice IRR that others can't even think about.

Reply

#20

This is from Total's website and explains some of their precesses in getting an LNG project up and running. Mentions getting contracts in place sometimes "well ahead of FID" but that doesn't necessarily mean at the stage Papua LNG is today. They are more than thorough as any of these Operators are.

"Total’s talent for managing liquefied natural gas (LNG) projects is on par with our prominent rank in this highly competitive industry. From securing contracts to managing the construction of LNG facilities, we possess the full range of capabilities needed to get to grips with the complexities of this unique type of development.


Large-scale Projects and Distinctive Characteristics


We have provided ample proof of our ability to meet expectations, deadlines and budgets as operator of large-scale, technology-intensive oil and gas developments, particularly in the deep offshore. While LNG projects certainly include scope for technical innovation, they also have several distinctive features that it is essential to be proficient in:

  • Projects have a long development cycle, with gestation sometimes lasting more than 20 years.
  • They require a consensus among partners, joint shareholders in the company that owns and operates the liquefaction plant.
  • They involve many different parties and a range of cross-disciplinary expertise (gas supply, liquefaction, marketing).
  • The Final Investment Decision (FID) is contingent upon the solidity of the many agreements that underwrite the economic viability of the project. Total’s involvement in numerous LNG projects — Yemen LNG being just one example — testifies to our skill in arranging and leading such projects. We can draw on our experience operating in a wide range of geopolitical and geographic environments to come to the negotiating table with tried and tested solutions that cover every phase of the project, from upstream to the LNG midstream. Our skill in managing risks and schedules constitutes the backbone of expertise needed for projects that are as complex as they are capital-intensive.


Focus – Anticipating every type of risk


All categories of risk — economic, technical, commercial, social, financial — are itemized in a formal register. For each risk, the likelihood of occurrence (from very unlikely to almost certain) and a quantitative estimate of the consequences (technical, financial and image-related) are assigned. Mitigation strategies are defined and contingency plans mapped out to address all potential problems.

This risk management tool is built into the Overall Integrated Master Schedule that coordinates all project-related activities (e.g., construction, marketing and financial transactions). The key objective of the tool is to identify critical operations at the earliest possible stage in order to deploy all the organizational, human, financial and other resources required to stay on track.


In-Depth Knowledge of Markets


You cannot become a dominant player on the LNG stage without predicting future trends in natural gas consumption. That’s because the future needs of importers necessarily determine the fate of projects on the drawing board today.

Total’s ability to determine whether it is the right time to launch an LNG project stems from the complementary skills of our teams of analysts in Exploration & Production and Gas & Power. Every year, as they consolidate their forward-looking analyses into a “global gas assessment,” they forecast trends in global gas demand for the next 20 years. 

We apply our knowledge of markets to negotiate long-term LNG sale and purchase agreements, often well ahead of the Final Investment Decision on a project. Moreover, we are now almost always on the list of direct customers of the liquefaction plants in which we are an equity partner. Our capacity to market significant volumes of LNG directly makes us a partner of choice.


Managing Complex Contractual Frameworks




montagegestion-visuel-texte-qatargas


An LNG carrier loading its cargo at Qatargas 2.


Many different parties are involved in bringing an LNG project to life, including host country authorities, communities neighboring the project site, natural gas suppliers, the liquefaction plant operating company, the liquefaction technology owner, shipping companies, contractors that design and build the project, and gas purchasers. Assembling the many pieces of this vast puzzle entails a highly structured set of contracts combining commercial law, tax law, public and private international law, not to mention construction law and competition law. 

As it advances from one phase to the next, a project gives rise to hundreds of contracts. The key agreements are:

  • The gas supply agreement.
  • The gas transmission agreement (from the field to the plant).
  • Contracts between the shareholders/partners in the project, particularly to establish the entities that sponsor the project and for project financing.
  • LNG sale and purchase agreements.
  • Shipping agreements (shipbuilding contracts and charter parties).
  • Regasification contracts.


Focus – Angola LNG Contracts


  • Gas supply and transportation to the plant: five executive orders, 90 contracts, 50 contracting parties.
  •  Legal, tax and customs systems governing the plant and its production: three legislative bills, approximately 20 regulatory agreements at the ministerial or other level.
  • Project governance and financing of operations: establishment of five companies entailing 200 agreements with shareholders or third parties.
  • Minefield clearance and site preparation, licensing of the liquefaction technology, construction: more than 50 contracts signed with as many contracting parties.
  • Lifting of the LNG, shipping, regasification, transmission: 50 contracts with 50 different contracting parties.


A Reputation for Operational Expertise




montagegestion-visuel-texte-yemen


Through our involvement in numerous LNG projects,
we have demonstrated our ability to arrange and
manage these large-scale undertakings. Here,
Yemen LNG.


Due to the sheer scale of the undertaking, building a liquefaction plant is really a project within a project. It entails selecting the site, readying it for the extensive onshore and offshore infrastructure, mitigating all the impacts, contributing to improvements in living conditions for neighboring communities, and managing colossal construction projects  — sometimes in extremely remote regions.

Total has had the opportunity to demonstrate our full scope of operational expertise in connection with the development of Yemen LNG. As the main shareholder, we were the technical and commercial leader of the project.

From the earliest stages, the project’s technical concept was defined and coordinated with a comprehensive plan to mitigate its potential impacts and preserve the environment. The 320-kilometer-long pipeline corridor bypassed farmlands and other areas of importance to local communities. Offshore, the 1,500 coral colonies most exposed to the future rotations of LNG carriers were transplanted. This highly successful operation marked a world first on such a large scale.

In 2005, the Yemeni authorities approved the development plan proposed by Total and our partners. Four years later, the first liquefaction train came on stream, and the plant ramped up to full capacity with the start-up of its second train in 2010. This feat required the construction of a veritable city with the capacity to accommodate the nearly 10,000 people mobilized for the project in an extremely remote site, completely lacking in infrastructure of any kind."

- See more at: http://www.total.com/en/energies-experti...XytRh.dpuf

Reply