Euro Giants Target PNG as Investment Destination
#11
All of the research firms agree that we have enough gas for a 2 train plant . The beauty of the Hession deal is what we fail to prove out on this first certification we get paid on in the Second certification. Plenty of time to drill the western flank and do it right as PET suggested with 3 wells along the Western fault and more wells to define size better . With oil prices still weak so reduced cash flow for Total and Oil Search hard to see their motivation for a higher payment today .
Reply

#12

'ArtM72' pid='62177' datel Wrote:First time we've seen gas chemistry in years as I recall. 5.8% CO2 and 150-180 ppm H2S. Sour by Texas Railroad Commission standard of 24 ppm. No big deal I suspect. Interesting statement that gas marketing will be finalized prior to going for financing. Also, Total is adding 475 kboe/d of production in the next two years. That seems to be a bunch.

Nothing interesting about that statement.  This is S.O.P.  in LNG world.  Sign up foundational buyers for ~80% production is required for financing.  Since LNG is a point to point business no SM would spend $20 billion without guaranteed, contracted buyers in place.

Reply

#13
JFT: I hope this helps. Basically anything that doesn't burn just takes up space.

Here are some CO2 contents of US Shale Gas Plays:

Barnett........................2.5%
Marcellus.....................less than 1.0%
New Albany..................6.0 - 10.0% ( this is in ILL / IN / KY )
Haynesville...................4.8% ( this is in Northwest LA )

Gas processing removes one or more components from gas to prepare it for use.

Common components removed to meet pipeline, safety, environmental, and quality specifications include H2S, CO2, N2, heavy hydrocarbons, and water.

The technique employed to process the gas varies with the components to be removed as well as with the properties of the gas stream (e.g. temperature, pressure, composition, flow rate).

Acid-gas removal is commonly by absorption of the H2S and CO2 into aqueous amine solutions. This technique works well for high-pressure gas streams and those with moderate to high concentrations of the acid-gas component.

Physical solvents such as methanol or the polymer DEGP, or Selexol may also be used in some cases.

Natural gas that has a water content in the reservoir requires dehydration to increase the heating value of the gas and to prevent pipeline corrosion and the formation of solid hydrates.

In most cases, dehydration with a glycol is employed. The water rich glycol can be regenerated by reducing the pressure and applying heat.
Drivel Maven with Personality
Reply

#14
stavros - So lower CO-2 numbers are a positive . Looks bullish compared to your reported Arun number . Thanks
Reply

#15

PNG LNG put out a document back in 2008 showing the Greenhouse Gas effect that PNG LNG would have.  On page 33 of this report they give a breakdown of various LNG projects and the reservoir gas CO2 %.  PNG LNG is quite low (0.7%-2%) and our 5% is a bit high per this table:

http://pnglng.com/downloads/eis_appendix25.pdf

Reply

#16
Whatever the C02.levels most people Papua LNG has lots more gas already discovered plus future reservoir engineer expectations than PNGLNG . More PNGLNG gas has been hard to prove out for them vs Ant 4 and 5 results . PET thinks 10 T area on latest results .
Reply

#17

'Palm' pid='62178' datel Wrote:

'jft310' pid='62174' dateline='<a href="tel:1440674 Wrote:Michael Lynn has stated that Ant 7 if approved would be drilled concurrently with other appraisal activities . No word on 7 yet.

Michael Lynn is not speaking for the Operator any more except for the Ant 4 S1. From Ant 6 on it's what Total thinks is best for the most part. Both Total and OSH only care about having enough gas for 2-train startup and have little interest in proving up more gas that will cost more for Certification. There's little doubt that with 6 they will have enough for the 2 trains IMO.

I feel sure IOC in working with Total has a good understanding of how the appraisal is and will be proceeding, and that they are not being muzzled and forbidden from communicating with shareholders about it.  Lynn did indicate the likelihood of significant simultaneous drilling if Ant 7 is approved, and he would not have done so without good reason to expect so.

Reply

#18
So Getit heard what I heard about 7 . One thing for sure they have ordered another rig due to be delivered in Aug 2015. That could maybe be used for 7 . Of course it's a group think question and answer. No word yet .
Reply

#19
IMO there is little chance Ant 7 gets spud this year. Not sure but I don't remember seeing that site prep has begun, which would mean that a request to the gov hasn't been made and/or granted. The JV can't just make a decision to drill and then spud in 30 or 60 days; seems we'd have that down by now.

The HA rig ordered for Aug is already in the country, but HA just stated that it's their understanding that any spud will take place in January, if that rig is possibly for Ant 7. That's the earliest I think Ant 7 would be spud IMO.
Reply

#20
Well we have not heard about a decision yet , based on that info they havn't applied to drill 7, and site preparation is normally 60 days plus depending on the topography and roads etc . Four months left this year plus rainy season ahead . Not looking like 7 this year seems fair . Must mean they don't need 7 to have sufficient gas for a 2 train project . But we sure don't hear about things as they happen . Dim chance though near zero .
Palm please post or repost your article about HA rig arriving in country and their Jan expected use . Thanks
Reply