Posts: 71
Threads: 0
Joined: Nov 2014
Reputation:
14
08-03-2016, 03:11 AM
(This post was last modified: 08-03-2016, 03:12 AM by weaselpuppy.)
tr.tbn" name="OAOt_C82qRwS1M:" src="https://encrypted-tbn1.gstatic.com/images?q=tbn:ANd9GcTB3ebsPyUqUvAP_3Bmo_bE0D4G1cva7hhz9NHM9t5yAIue4Qmy" style="width: 291px; height: 173px; margin-left: 0px; margin-right: 0px; margin-top: 0px;" />
"Clawbacks? Ummm...what if we already spent it all?"
Just when I thought I was Out....They Pull Me Back In! -Michael Corleone about the mob and Weasel about investing in IOC
Posts: 2,505
Threads: 219
Joined: Dec 2011
Reputation:
109
08-03-2016, 03:17 AM
(This post was last modified: 08-03-2016, 03:17 AM by Putncalls.)
At least Moe Green had the opportunity to pick a price.
Posts: 757
Threads: 97
Joined: Nov 2012
Reputation:
102
The Arun field made Mobil LOTS AND LOTS of $$$$. This field will do the same for Exxon now if the deal goes through.
As far as Hession is concerned, not to go into Psychoanalysis, but he seems to me the type of person that only cares about someone's stature/title. He doesn't want to build an exploration company, he wants to impress the "big" boys. The SM. Show them that he can help them out. They will end up screwing him over as well once they have used him. He is a DISHONORABLE person. This is evident from miles away.
Posts: 757
Threads: 97
Joined: Nov 2012
Reputation:
102
I posted this on snother thread and think it's important:
Per this cc transcript Total is telling us that IOC is effectively blocking this project by existing. They say they will not bid because Exxon unblocked the project and this is their only goal. Be that as it is, vote no on this deal and Interoil is in play still. We will never get a better deal unless this is voted down.
Posts: 91
Threads: 6
Joined: Mar 2013
Reputation:
23
How about this for a sweetened XOM bid, I would vote YES to this. Keep the existing deal as it stands with these exceptions. 1) Remove the ceiling on the certification number. 2) After drilling / testing A7, XOM and TOT each name an independent reservoir engineering firm to certify the field. 3) IOC gets to name GLJ as the 3rd certifier. 4) Payout based on the average of the 3.
With modest success at A7, I think GLJ would be >12 TCFe, the other two should come in around 8 to 9 TCFe based on the recent OSH certification numbers pre A7. This makes the average about 9.5 TCFe and a CVR valuation around $20. This gets me to the "minimum" I would like to get for my shares of ~$65 each (combo of the CVR and XOM stock).
Posts: 2,505
Threads: 219
Joined: Dec 2011
Reputation:
109
The brown field Papua LNG development costs a lot less. Total had to FID there own greenfield project. XOM will release them from that obligation.
Posts: 8,568
Threads: 1,342
Joined: Dec 2011
Reputation:
380
The banks require before loaning money an FID on the project . Even an Exxon train 3