10-06-2016, 10:40 PM
|
Nauilus Minerals Vessel Progress Update
|
|
10-07-2016, 08:20 AM
love the ship pictures
10-07-2016, 06:28 PM
in the water... https://ramumine.files.wordpress.com/2016/10/nautilus-ship.jpg
10-07-2016, 11:44 PM
a little detail from this article...
http://www.stockhouse.com/news/press-rel...ess-update Vessel progress to date: (See links section below for some pictures of the PSV). Item Completed % Production drawings issued >90 Steel cut (out of a total 20,068 tonnes) >90 Blocks completed structure fabrication 90 Blocks completed assembly and painting 83 Blocks lifted to dry dock 65 Blocks completed erection in dry dock 36 Read more at http://www.stockhouse.com/news/press-rel...pYPqI6c.99
10-09-2016, 04:46 AM
How will they pay for the lease and the crew? That is the problem with this story.
10-10-2016, 06:38 PM
I don't think that they forgot this fact...
10-11-2016, 11:04 AM
'seabedmining' pid='76758' datel Wrote:I don't think that they forgot this fact... They haven't discussed what they might do about it. Any specualation about cost per day to operate the ships and the sea floor equipment? Has Nautilus every suggested what they thought their costs during the first year of operation will be? I looked at some of their early annual statements and did not find anything. But might have missed something.
10-11-2016, 06:57 PM
I remember reading the cost to lease and operate the ship was right at $200k per day..
10-11-2016, 08:18 PM
'Carthum236' pid='76792' dateline='<a href="tel:1476176 Wrote:I remember reading the cost to lease and operate the ship was right at $200k per day..
$73 million a year including staff. The option to buy will be available after 5 years I think. By that time, the technology will be well proved and investors will be piling on.
10-12-2016, 12:22 AM
at this time some of us are living on the (very) bright side of life :-):-):-)
|
|
« Next Oldest | Next Newest »
|
Users browsing this thread:

