PRE put out presentation in early July. Had comments on slide 15 about T2:
Triceratoops Field – Potential Gas Column Height
Triceratops – A Giant Structure
• Earlier Triceratops-1 and Bwata-1
wells drilled on flank
• Triceratops-2 drilled up structure
increases hydrocarbon column
• Indicate potential for 5,500 ft gas and
liquids column
• Triceratops-2 successfully drilled to
target zone to depth of 6,569ft (gas
and condensates shows encountered)
• A 2,086 ft interval of gross carbonate
drilled
• Additional interval below water line
believed to be a potential gas pay
• Dolomite, indication of secondary
(increased) porosity encountered
• High Reservoir permeability evidenced
by frequent drilling fluid loss
• Plans for testing underway
If this has been posted before, I apologize; don't remember seeing it.

