12-01-2012, 12:03 AM
|
..."This should allow InterOil to manage service industry cost as we ramp up to a two well drilling program without straining the available resources in PNG.
..."Furthermore, we are pleased to have the support of Minister Duma and the DPE to allow flexibility to control costs and logistics of a two rig operation," said Mr. Phil Mulacek, Chief Executive Officer of InterOil." |
|
Looks like IOC plans on using their crack drill team on Ant-3 and Elk-3 consecutively, rather than importing/staffing for a second simultaneous drill team and Duma agreed.
|
Sorry Shorts, there is nothing scary here.
This post passed both the BS & Rubbish detection Tests.

