03-06-2012, 02:16 AM
Raymond James Institutional Investor Conference - March 5, 2012
http://www.interoil.com/presentation/201..._Final.pdf
http://www.interoil.com/presentation/201..._Final.pdf
|
RJ presentation
|
|
03-06-2012, 02:16 AM
Raymond James Institutional Investor Conference - March 5, 2012
http://www.interoil.com/presentation/201..._Final.pdf
03-06-2012, 02:21 AM
31 March 2012, so they say
03-06-2012, 02:27 AM
Drilling Update
InterOil’s Rig #2 is currently drilling ahead with a 12 ½ inch bit As of March 5th, the current depth is 4,040 feet (1,231 meters) Top limestone revised estimated at 4,070 feet (1,241 meters) The plan is to drill the entire reservoir interval with a predicted total depth of the well of approximately 7,182 feet (2,189 meters)
03-06-2012, 02:30 AM
Triceratops-2
Drilling at 1,231 meters Marl detected at 1,213 meters Back Ground Gas with C1 to C5 Triceratops-2 Forward Plan Drill to top of carbonate Run and set 9 5/8 liner Conduct vertical seismic profile (VSP) Run 9 5/8 tie back with dual down hole deployment valves (DDV) Install managed pressure drilling equipment Test blow out preventer (BOP) Drill into reservoir Conduct drill stem test (DST) Drill to base of carbonate Run wireline logs and test Take rotary side wall core plugs
03-06-2012, 02:30 AM
Maui, how does that work? Do they take samples and pressures along the way to see what they have at each segment? Does that mean they need to get to 7,182 ft to know what they have? Thanks in advance.
03-06-2012, 02:33 AM
ebster - let's wait for pet's interpretation, I'm just the timeline & slide guy LOL
03-06-2012, 02:35 AM
But you do have one heck of a fish as well!!
03-06-2012, 02:58 AM
7-10 days till punch into gas
Coal means reafal and found in ant1
L Ron Rules!
03-06-2012, 03:08 AM
>> my notes on key takeaways that weren't specifically covered in presentation
Wayne A. Updated resource results on Y/E call week of March 19th Intention to award on CSP bid Pre-FID spending continues to protect late 2014/early 2015 startup date As of today, completed drilling to top of reservoir - setting casing Coal found indicating shallow water environment (same as Ant) Conduct DST in first 2-300 feet of reservoir ~7 to 10 days to tie back liner from today Tuna looks very similar to Ant with reef build-up, along with offshore similar structures Drill 2nd well from same site to test top of structure Rig 3 to drill Ant 3 first; will move to field when road is complete Operating business (refining & downstream) funded half of capital needs Waiting for certain approvals from PNG government Start with 5mpta then bring in partner to get to full 7.4-10 mpta capacity Q&A Dec 31 extended EWC & Flex agreements, not FID date - FID is company determined date; waiting on PNG approvals Last 2 months a lot of engineering work has completed; ready to award many bids CSP bid will be awarded upon FID PNG gov effort is a fulltime lobbying effort - takes time to move ahead, based on NEC & sub-committee timeframe Sell-down is working in parallel to FID - one group came to meet with PNG government Permission from PNG would help with partnering process DST results in 2-3 weeks; possibly sooner Partner would accellerate drilling Exploration has been historically underfunded - E/A sell down would accellerate drilling Plenty of interest in exploration partners, easier part of process than LNG partner Flex needs PNG gov permissions to move ahead PNG moves at it's own pace - things take time; IOC sets aggressive goals but dependent on PNG timing |
|
« Next Oldest | Next Newest »
|