As, 2 TCF = 2Mtpa x 20 yrs.
then, ennerOle needs 10 Tcf recoverable for 10 Mtpa plant x 20 yrs. life.
GLJ @ 8.6T
GC @ 6.6T
An unamended 2009 PA could require an approximate additional 1.4 - 3.4T's and we are counting on T-2 for that.
With JKM and T-2 success and a scheme for larger start-up volumes it will be a slam-dunk. C'mon T-2 resource engineers, you can do it!
Posts: 6,851
Threads: 697
Joined: Dec 2011
Reputation:
441
But tree, can they possibly have enough? If you split the diff on those estimates of EA you are at 7.5 TCF. We need 7.6 mtpa for minimum startup per PA. If T2 is at least same as EA that means we have 15 TCF. Doesn't that mean we have to have 50% recoverable then? Think that's even possible? I'm gobsmacked by the possibilities.
Posts: 4,164
Threads: 1,500
Joined: Dec 2011
Reputation:
268
Duckstein, it does appear as a gimmee.
We can agree the PA needs amending -or- ennerOle meets the requirements within, above reproach. Until T-2 is estimated they likely do not even know what amendment is required, if any. Me hunch is, O'Neill and NEC will do nothing until, and if it is shown through T-2 results, that the PA needs amending. PNG/IOC/JKM has until mid-late 2012 to start construction to meet the late early 2015 1st gas goal.
If IOC needs an amendment, then I think we see O'Neill making it happen Cap'n.
In the perfect world, IOC needs the amendment to allow initial 15Mtpa production facilities, not just the wimpy 10.6!!
Posts: 2,623
Threads: 61
Joined: Dec 2011
Reputation:
225
Tree, I'm not sure I understand what you're saying. It is my understanding from IOC that they have submitted a slightly modified PA to the NEC for the Gulf LNG project that they expect to be approved, and that it is covered by E/A and does not require any additional resource amount from T2, although
T2 could provide for further expansion later. Are you saying you do not think that is correct?
Posts: 4,164
Threads: 1,500
Joined: Dec 2011
Reputation:
268
Getit,
Good that IOC has submitted modified wording to NEC. Point is NEC has not amended PA. Why? We do not know what is literally all required of IOC as to the burden proof of recoverable gas. Competition (SHELL) could be requiring NEC to stand firm on their 2009 PA. Who knows.
This from the Somare era Q3 2010 CC implies Somare was allowing IOC leeway.
Phil:
'We are not drilling in Q4 10 because we DO NOT NEED to drill anymore to achieve 3mtpa EWI plant and Mitsui CSP.'
Could it be larger start-up is requiring larger recoverable T count, hence the T-2 spud now? Either way, my point is we have no PA amendment and we are drilling and will likely have shown plenty of gas and may not need an amendment anywhoo.