I looked back at some posts I made in early June, I made two posts titled: "The Deal" and The Deal II." Here are those posts and what I believe to be very accurate information at that time. It is interesting to contrast these details with the TOTAL deal.
1) Exxon is the winning bidder. In the natural evolution of negotiations, Interoil selected Exxon as the winning bidder. They have a signed terms sheet. Management did not want to issue a press release until the final terms were complete. However, counsel advised management the signing of the exclusive negotiations document between the two companies was a material event and necessitated a press release. The release was drafted by both Exxon and Interoil.
2) Interoil requested the recertification of Elk/Antelope. The concept is simple. Exxon is buying 4-4.5T right now. 4.5T is approximately 50% of the GLJ certification currently. Interoil believes the resource is larger. Once the recertification is complete, the % ownership of E/A will be determined. If there is 12T, IOC doesnt want to Exxon to have 50% interest but rather 33% (4T/12T for simple math). Importantly, IOC will be able to choose what they want to do with the remaining gas in a separate deal......whether thats a Gulf LNG or selling more gas to Exxon. I'm told Exxon will be motivated to buy more gas from IOC and will be very competitive with any other alternatives.
3) There will be approximately 1.5 billion in infrastructure costs for the pipeline, gathering system and CSP (Exxon and IOC will be partners in the CSP). The costs will be split based on the % the recertification determines (i.e if Exxon is buying 4T of 12T or 33%...they will pay $500 million and IOC will pay $1 billion). Exxon will carry IOC on these infrastructure costs.
4) Payments to Interoil will be staged. The carry for infrastructure, recertification, and an upfront $ payment........ plus additional $ at other stages.
5) Expect the deal to be in the 4 billion to 5 Billion range. (4T-4.5T x $1.00-$1.20)
6) The pipeline, gathering system, and CSP should be operational in 24 months.
7) The cost overruns Exxon experienced at PNG LNG motivated them to add trains sooner rather than later and improve the economics of the project.
8) Interoil will have flexibility to pursue other deals but expect the Exxon/Interoil partnership to grow over time.
9)The PNG govt will get more $ faster......they are very supportive.
10) The final details will likely be completed easily within the 60 day period. Expect a new CEO this summer.
1. Maybe this needs no clarification, but in order to make sure we are all on the same page as much as possible (or at least you know where I'm coming from) let me clarify the transaction. This is not selling gas to Exxon. This is selling an ownership interest in PRL 15 to Exxon. The long anticipated "sell down." Again, this may be clear to many but this is a different transaction than many of us contemplated (no Gulf LNG at this time). Importantly, there are no capital gains on this asset sale.
2. Exxon and Interoil are now partners. Pretty obvious I realize but the importance of that statement cannot be emphasized enough. Exxon is our partner in PRL 15.
3. Don't confuse cash price...all in price...or any other price. Interoil will receive $5B +/- from Exxon for their purchase of 4.6T. (staged payments with some upfront) Ownership % will be determined after the delineation wells and recertification takes place. Exxon will likely end up owning somewhere between 33% and 50% of PRL 15 (4.6T/ Total Recertified Resource). THAT IS THE DEAL.
4. From the $5B +/- Interoil receives, they will contribute $1B +/- to the pipeline, gathering system, and CSP construction costs (same % as their ownership stake)
5. Interoil and Exxon will be partners in the CSP. I have done this part an injustice. With the liquids selling for close to $100 a barrel currently, this will be quite meaningful to Interoil.
6. Exxon will be building 1 additional train at PNG LNG at this point. The ownership structure of that train is being/will be negotiated. Obviously, Exxon has existing partners. It is possible Interoil will trade some of the $5B +/- for an ownership stake in the 3rd train. Emphasis on "possible."
7. The partnership and infrastructure will allow Interoil to convert resources into reserves at PRL 15 and likely Triceratops as well.
8. The price Exxon is paying was not the highest price offered. This is about today AND tomorrow. The partnership with blue chip Exxon and the infrastructure unlocks huge value for Interoil and makes everything down the road far more valuable.
9. Modular and Floating are not here today but their acceptance is growing and can't be ruled out at a later date.
10. Kavo is fully supportive as massive infrastructure & CSP will be added to the Gulf Province. Gas flowing through the pipeline will kick in landowner 2% royalty far sooner than Gulf LNG. And he knows this is just the beginning.
11. As the infrastructure is being built, a return to drilling can commence as new discoveries can be easily monetized and are economically viable.