I am tired of waiting for drilling results so have been wondering about other aspects. Exxon says they spent 23 billion on their plant and say the most difficult was the piepline. How much of the 23 billion was for the piepline?
How may miles is it and how many miles is it to EA? If gas were sold to OSH, either 1 or 2 trains, Would it not be economical to use the same pipeline to transport gas to a floating LNG plant?
Pipeline costs must include right of way, clearing, pipe, burying pipe There must be economies of scale.
How can OSH make an intelligent offer if they do not know what the pipeline will cost and how these costs will be shared? My point is that someone must be working on all this..
Hession says that economies will answer the questions and make the decisions. Meanwhile we have 5 to 10 billion of assets just laying dormant.