'Getitrt2' pid='48089' datel Wrote:
'Kaliboo' pid='48055' datel Wrote:
For those who are really bored counting the days since spud of the exploration program, you can now do it in an instant ad naueum.
Just plug in the Current Date and any new Suspension date or End date, and you get the outputs in the yellow columns.
Key things to note. It's now 39 days since AGM presentation when reportedly Raptor and Bobcat were "drilling to the next casing point above the target zone".
Gotta be getting very close on an announcement on these wells.
It's 19 days since Wahoo suspension was announced. According to Hession they are working to quickly get back on the well. We'll see how quick, quick is.
Kaliboo, where did you get the supposed quote from Hession of "quickly"? That word was NOT used in the PR or in the website comment from Hession.
Getitrt, you are overanalyzing. I didn't quote Hession. I didn't use quotations. The press release is official so it must be "according to Hession." Here's what it says:
Operations to resume as soon as practicable
InterOil intends to resume operations as soon as practicable following a detailed review of well engineering, equipment and options, when the company is satisfied it is safe to proceed, and after the regulator has approved the company’s plans.
To me that is quickly. Otherwise they would have said something else. As quickly as they can analyze it, come up with a new plan, get government permits to re-enter the well, get all the equipment and materials, and remobilize, then they will resume drilling. That's about as quickly as it can be done. Or as soon as practicable. Lots of things can make this a lot longer than what we want to hear. But it is clear they are not intending to walk away and park it. I hope that clarifies.