Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Look at slide 21 /comparison Kapuri/Wahoo
#1

Very interesting numbers at Kapuri. Hope thats Wahoo's future

Reply

#2

So now Wahoo has become a when not if.. They could have drilled it, fulfilled the obligation and moved on - so I find this re-effort very interesting.  Question is, what do they do differently?  New rig, same rig with diff bits, horsepower or heavier mud.. or something else.  Pet, any thoughts?

Reply

#3

'Dr. Wu' pid='48476' datel Wrote:

So now Wahoo has become a when not if.. They could have drilled it, fulfilled the obligation and moved on - so I find this re-effort very interesting.  Question is, what do they do differently?  New rig, same rig with diff bits, horsepower or heavier mud.. or something else.  Pet, any thoughts?

Dr. Wu- Slide 21 can be interpreted to mean they are only at about 4,000 feet. Hession would not answer a question about up grading the rig. At the apparent depth of this well the rig horsepower should not be a problem. I think they wanted to change the BOP from a 5,000 psi to a 10,000 psi before proceeding. If they want to use managed pressure drilling like they are doing at Bob Cat and Raptor they may also need a high pressure rotating head. Other wise I think the equipment should be OK. I believe they may have used up all of their casing sizes too early and the hole size got too small. They may need to start over from the surface with a new casing program. Either more sizes or set the casing strings deeper as they go.

If they are at about 4,000 feet I do not think the pressure can be more than 4,000 psi at that depth. At this depth their report of the pressure being "nearly 1.5 x Antelope" still does not compute. They have mentioned gas but have not said their mud weight was unable to control the pressure. If they are near 4,000 psi at 4,000 feet they would need a mud weight of over 19 lb/gal. Mud that heavy would probably be hard to handle, especially in a small hole.

I guess we will have to wait and see what the new plan is and when it will commence.

Reply

#4
Thank You Pet. In the world of engineering chips if someone says "re-architect" in the middle of a program their would be heart attaches and mass suicides, along with scape goading and messenger shooting, as the 3 year delay would surly mean that our leader would either fall on his sword or be cast into the wilderness.

How long would it take to re-architect and implement a wahoo plan?
Reply

#5
One person states a 90 day delay are they right?
Reply

#6

'jft310' pid='48474' datel Wrote:

Very interesting numbers at Kapuri. Hope thats Wahoo's future

Some Friday fun.  Appreciate the pink highlighter used to denote the drill stem location in the seismic of Wahoo (Pg.21). Contrasts well with the backgound and, um, err, hmmm. Does not appear to be uniform.  Looks like there are gaps and varying thicknesses in relation to depth.  The bottom well stem horizontal is a bit flashy.

A little extra color for your day.

Happy Friday Folks

Tucker

Reply

#7
I was told they had pipe problems and had to drill around the stuck pipe several times which would explain the drill stem color movements maybe.
Reply

#8
I don't think so. Tucker's visual acuity is kicking in again. He likie flashy/shiny.
Reply

#9
Who am I to argue with Tusker's visual acuity!!Never will happen!
Reply

#10

"Some Friday fun.  Appreciate the pink highlighter used to denote the drill stem location in the seismic of Wahoo (Pg.21). Contrasts well with the backgound and, um, err, hmmm. Does not appear to be uniform.  Looks like there are gaps and varying thicknesses in relation to depth.  The bottom well stem horizontal is a bit flashy.A little extra color for your day.

Happy Friday Folks"

New IOC drilling update



Attached Files Image(s)
   
Reply



Forum Jump:


Users browsing this thread: