Thread Rating:
  • 3 Vote(s) - 3.67 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Credit Suisse highlights by page
#1

Some may have missed the Credit Suisse report

Heres some of the High lights page by page

Page1-range of estimates is 6.8 to 10.9 TCF. At 10 TCF valuation is $113 .

Page 3-Interoil is well funded, more upside then downside.

Page 5-GCA estimate Dec 2013 7.0 T's of gas.

Page 6- Antelope Deep is not part of resource estimate

Page 8-Antelope 4 and 5 are estimated at 90-120 days

Page 9- LNG buyers prefer expansion of projects

Page 12-If 10 TCF now valuation is $113 and $159 at FID

Page 17- Total payment contingent on 2C resource size

Page 19- Unrisked exploration is worth $58 a share which is net of all drilling costs

Page 22-Interoil cost to build is $4.5 Billion , with 70/30 financing Interoil needs $1.4 Billion with 7.1 T's a small debt or equity raise might be needed.

Page 26-,Forecast LNG compound annual growth rate at 6 percent .

Just pull the report for any questions.

Reply

#2
I remember when 10tcf would value us at 250, but alas. I would be thrilled with 113 and 159 heeeeeeeeeeeck yes. . Those are positive notes.
Reply

#3
I think Bernstein was $120 at FID plus $10 for each successful well in the WBR program . Close if we hit at these wells .
Reply



Forum Jump:


Users browsing this thread: 1 Guest(s)