Exxon Mobil’s two-train PNG LNG is just the beginning for Papua New Guinea, which may have another four trains or more on stream in the next decade, a buoyant PNG energy minister told World Gas Intelligence on the sidelines of the CWC conference in Singapore last week.

“There will be an expansion of the current PNG LNG plant. They can put two more, so four trains. Elk-Antelope is another project which can put two trains initially. So we can have six trains in the next 10 years, or even seven trains,” Energy Minister Nixon Philip Duban told WGI; that potentially could bring capacity to up to more than 50 million tons per year.

Equally optimistic, PNG-focused Oil Search’s Managing Director Peter Botten told WGI that he hopes to see three more LNG trains on line, or close to completion, by 2022 with Oil Search holding a 20%-30% stake in all of them. It is already the second-largest shareholder, with 29%, in Exxon’s 6.9 million ton/yr PNG LNG.

Oil Search has good reason to bet on these future trains, as it has stakes in the country’s most prospective licenses, which include the Hides, P’Nyang and Antelope/Elk discoveries, for which all projects are competing. But its influence may be checked by the PNG authorities, who hint they want to see more investors in the country. “We feel Total’s inclusion in Elk has brought more promise to the project [...] With Total, we want to have diversified participation,” Duban said, even though the government owns around a 9.8% stake in Oil Search.

Nine months ago Total outbid Exxon and bought a 40.1% stake in InterOil’s PRL 15 Block that includes Antelope and Elk, together estimated to hold 3 trillion to 12 trillion cubic feet (85 billion to 340 billion cubic meters), possibly enough to feed a two-train greenfield LNG plant (WGI Sep.10’14). Oil Search in February bought a 22.835% stake in PRL 15 and referred Total’s purchase to arbitration.

The arbitration, expected to conclude in early 2015, is to ensure that all partners are playing by the same rule book, Botten said. But the rumor mill says there’s more to it: Oil Search would prefer to see Exxon replace Total and use the PRL 15 resources for a PNG LNG expansion — which would be more cost-effective than a greenfield plant and be quicker to bring to the market.

Botten says it is too early to see how developments will unfold. He describes the company’s move on PRL 15 in terms of resource optimization, the goal being to avoid a Queensland-style situation where three competing coalbed methane projects failed to cooperate, and consequently saw costs explode (WGI Nov.27’13). “The track record [for cooperation] is not particularly good in the LNG industry. We would like at least a constructive dialogue between all parties over the next twelve months. If it is not successful, we can still get high returns,” he noted.

Ultimately, it is the size of the resources that may determine how these are developed, Botten says. An appraisal campaign is under way, with the resources to be certified next year. If only 3 Tcf were confirmed, then tying the reserves with a PNG LNG expansion could be the easiest way, Botten said. Resources of 7 Tcf or more would allow multiple trains.

The clock is ticking for the three companies, with PRL 15 expiring next year. So a development must be submitted by then or the license withdrawn. “2015 is a critical year for the InterOil license. A prolonged arbitration is not in the best interest of any company,” Energy Minister Duban warned.

Beyond PRL 15, Oil Search and Exxon are not short of resources, with proven reserves at Hides, a gas field that already feeds PNG LNG, to be upgraded soon following successful drilling. A new deeper reservoir beneath Hides, called Hides Deep, may be developed easily given existing infrastructure. And then there is the P’nyang field on PL 3, in which Oil Search holds a 38.5% stake, and which has contingent resources of 2.5 Tcf. PRL 3 is also coming up for renewal in 2015 and partners hope to submit a development license application by early next year, Botten says. Such upside explains why Duban is optimistic that PNG LNG could add two more trains, even without InterOil’s PRL 15. But these many resources are yet to be fully appraised, and their development sequenced.

“A lot of things could come to clarity in the first half of next year,” Botten said. But first, the quickest and cheapest way to increase LNG output will be to debottleneck PNG LNG. He declined to comment on reports that capacity could reach 7.6 million tons/yr by 2016 but said the partners will take a close look at the plant and evaluate what can be achieved.

Reply

#2
<>

This feels like brand new information, I thought IOC's licenses were renewed for years... never heard Hession mention a peep about them being revoked NEXT year.
Reply

#3
My 2 - Interoil needs to file a development plan by year end 2015 . How's that bad news??thats good news !!!
Just like the pressure to keep the licenses outside PRL-15 with new drilling this is the same a way for the govt to be sure tbe gas gets commercialized quickly .
Reply

#4
Botten mentions a 3 B synergy effect if PRL15 teams up with PNGLNG. It will be difficult to substantiate this amount. Although the Highland pipeline is not maxed out, the idle capacity is normally speaking reserved for new finds in the Highlands. Looking at his presentation the PRL15 should feed train 4 and 5. For this development a new pipeline is necessary. According to Bernstein even a new jetty is necessary to support this expansion.

In my view the real reason for Bottens endeavor is his fear that he is not sure about his stake in the standalone LNG plant. After all IOC did not close a SPA with OSH and the production jv for PRL15 is not founded yet.
Reply

#5

'my2cows' pid='51211' dateline='<a href="tel:1414092 Wrote:<> This feels like brand new information, I thought IOC's licenses were renewed for years... never heard Hession mention a peep about them being revoked NEXT year.

He doesn't have to "mention" it as it's splashed around in the financials and YE 2013 AIM report. PRL 15 license expires at the end of November 2015. They know it and it's been fully disclosed. They are drilling as required (as mentioned also in the financials) and fulfilling all of their requirements.

Next we'll need to be worried about the 2016 elections.

Reply

#6

"Ultimately, it is the size of the resources that may determine how these are developed,"

I hear him reflecting what Hession has been telling him.

Whatever eventuates, I don't think the PNG gov't wants to tick-off Total.  And if the OSH BOD is smart, they won't want to either, with their international endeavors and all.  Botten?...as he's on his way out, may not care.