The new seismics clearly show where this talk about massive comes from in the last few weeks .
Further the tie back talk has broad implications.
The slides and presentation talks show the following formations feeding the LNG project.
Elk/Antelope
Triceratops
Raptor
Bobcat
Anyone worried about enough gas has not looked at the slides . One can see where the 2 train 9.9 Tons of production per year
talk comes from. PNGLNG is 6.7 tons so Antelope talk is 50 percent larger than PNGLNG . That's where this massive talk
comes from.
Further the selling of the gas in ground connected or not connected is peanuts . The payment might reach close to a dollar per
mcf. That's peanuts based on an all in LNG cost price of $7-8 per mmbtu. At a delivered price of $14 that's $6-7 of profit per
mmbtu.
Thats why the 30 percent LNG participation rate deal with Total was and is so important .
It literally means Billions of dollars of cash flow to Interoil Corp .
Further hint Total last year built a smaller LNG complex on budget in 3 years .
Total deal blew away any talk from Exxon and it's why Hession accepted the Total deal . Exxon had a chance but bid lower if
their bid had been superior the IOC Board would have accepted the higher bid. Horay to Hession for setting up the bidding war .