Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
The" massive "quote
#1

The new seismics clearly show where this talk about massive comes from in the last few weeks .

Further the tie back talk has broad implications.

The slides and  presentation talks show the following formations feeding the LNG project.

Elk/Antelope

Triceratops

Raptor

Bobcat

Anyone worried about enough gas has not looked at the slides . One can see where the 2 train 9.9 Tons of production per year

talk comes from. PNGLNG is 6.7 tons so Antelope talk is 50 percent larger than PNGLNG . That's where this massive talk

comes from.

Further the selling of the gas in ground connected or not connected is peanuts . The payment might reach close to a dollar per

mcf. That's peanuts based on an all in LNG cost price of $7-8 per mmbtu. At a delivered price of $14 that's $6-7 of profit per

mmbtu.

Thats why the 30 percent LNG participation rate deal with Total was and is so important .

It literally means Billions of dollars of cash flow to Interoil Corp .

Further hint Total last year built a smaller LNG complex on budget in 3 years .

Total deal blew away any talk from Exxon and it's why Hession accepted the Total deal . Exxon had a chance but bid lower if

their bid had been superior the IOC Board would have accepted the higher bid. Horay to Hession for setting up the bidding war .

Reply



Forum Jump:


Users browsing this thread: