Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Two drilling campaigns with Total
#1

We are involved with the first drilling campaign now . Two things to complete this campaign today . Complete Ant 4 and drill Ant 6 . No word on Ant 7 or to be determined . Expect a build size similar to PNGLNG . Then add on more trains .

The second drilling campaign seperate from this one is for Antelope South as described in the SPA . This is an exploration well with Total paying $64 million per T above the first one . Interoil's slides show an internal estimate from a Certified Reservoir Engineer of 5.5 T's .

Reply



Forum Jump:


Users browsing this thread: 1 Guest(s)