08-07-2015, 04:20 AM
Ant 4 was suspended at 2,056 meters TVDSS, or 2,134 meters measured depth, approximately 150 meters above gas-water contact. Assuming the planned total depth of 2,378 meters per OSH is measured depth, that would be another 244 meters to drill. Does that sound about right for the gas-water contact level indicated? Any of our industry experts care to project how long that should take? Think there is further testing they will do there other than incorporating Ant 4 into the flow testing with Ant 5? They should be able to mobilize the rig on to Ant 6 without waiting for the completion of the extended flow testing involving Ant 5, right?
|
|