The following is an update on rigs I posted July 7 based on information known as of that date, under "Summary of Rigs Drilling Which Well....???" started by "johnwgrant":
"On June 15, Triceratops was spudded with a new generation heliportable High Arctic rig brought into PNG by IOC and drilling in PNG for the first time.
Beyond that, Hession says the "absolute priority" for rigs is Elk/Antelope. The "fantastic" High Arctic 103 rig that did Ant 5 is now at Ant 4 about to drill the sidetrack there, which should not take long for the remaining depth. Then it is to be mobilized to the already prepared Ant 6 site, and with any luck drill that in two to three months.
Another New Arctic rig like the one at Triceratops will probably arrive in PNG in August ready to go. Where that goes probably depends on whether they do Ant 7, which would get priority per the above, which means Ant 7 could be spudded in late Q3 or in Q4, depending on when approved and site selection and preparation. That means completion of Ant 7 possibly around year end or early Q1 2016.
The other E/A priority is Antelope South. I would guess the High Arctic 103 rig would probably go there after completion of Ant 6 in PRL 15.
That is assuming Total does not bring in rigs to drill Ant 7 and/or Antelope South as Operator.
Another guess is that after the completion of Triceratops 3, they would use that High Arctic rig for the side track at Raptor 1.
Of course, Rig 3 is drilling the side track at Wahoo after resuming that drilling June 10. That rig is not heliportable, and I have not heard whether they would use it again; but given all the work put into it, perhaps they might for a Wahoo 2 or some other prospect in that PRL or other accessible site.
I also do not know whether they will again use Rig 2 now not in use at Bobcat, but Hession has indicated the intention to do appraisal at Bobcat also at some point.
I would say further appraisal at discoveries, including Antelope South, or drilling new exploration prospects are possibilities beyond these.
Given the drilling history before Hession, is all this not extraordinarily exciting, especially if they continue drilling with recent drilling efficiency?!!!"
Note that the High Arctic 103 rig now at Ant 4 is OSH's rig, not IOC's, and that per OSH on 7/21 it is expected to spud Ant 4 in Aug, and subsequently COMPLETE Ant 6 in Q4. Given the new IOC High Arctic rig due in PNG in August per above, I can see how they might be drilling Ant 6 and Ant 7 simultaneously, if they drill Ant 7.
Also per OSH in that report, Antelope South is expected to be completed (?) in Q2 of 2016.
vidon, what specifically would you suggest they should have done differently which would have been better "planning" or "management"?
Posts: 80
Threads: 16
Joined: Feb 2013
Reputation:
33
Fair question, so I must admit I am not on the inside and my reply may be ill informed. In my business I always kept a clear view of available resources and I always looked at potential applications for these resources.I weighed the risk/reward for each application and made certain my assets were always in use. My business was successful. It appears to me (an outsider and a shareholder) that IOC management may not have kept the available rigs drilling. They have frequently advised of the many prospects and need for additional drilling to appraise EA. we have A South, Raptor, Bobcat, Tri, and Wahoo. I had asked previously how many drilling rigs we had available. I look back at the stated objectives for drilling and then see the actual results do not meet their own objectives. These are very experienced men and we have been told are world class explorers, engineers, operators, managers. Their performance simply does not meet their own objectives. Not just once, but consistently and I hate to see my long term investment less than half its previous value since this team took charge. I do not know all their reasons for missing their objectives, just saying they have not drilled as they said they would. I
Posts: 2,505
Threads: 219
Joined: Dec 2011
Reputation:
109
Vidon,
I have no idea where you got the notion that anybody thought that IOC management was world class anything. Antelope is world class. PNG has the best LNG shipping location. Singapore might be better but there is no NG there.
Posts: 2,904
Threads: 58
Joined: Mar 2012
Reputation:
259
From a mid June High Arctic press release:
"High Arctic Rig 115 commences drilling first well
Calgary, Canada – June 15, 2015 – High Arctic Energy Services Inc. (TSX: HWO) (“High Arctic” or the “Company”) is pleased to advise that Rig 115 has started drilling operations in the Gulf Province of Papua New Guinea (“PNG”) under the previously announced two year contract. Although the rig has been generating revenue since late March, the take-or-pay contract term commenced with the spudding of the first well on June 15, 2015.
Tim Braun, High Arctic’s CEO, stated; “We are pleased to have Rig 115 operational in PNG, as this rig represents a significant increase to our service capabilities in the country. With the imminent deployment of Rig 116 from Houston, we anticipate the additional revenue generated from these rigs operating in PNG to significantly contribute to the profitability of the Company going forward.”
Rig 116 has completed its refurbishment and upgrading in Houston, and is currently being prepared for shipment to Papua New Guinea. It is anticipated the rig will arrive into the country in late August, and once drilling commences it too will be operating under a previously announced two year term take-or-pay contract."
So what we know from this is the "take or Pay" provision of HA's contract with IOC appears to have forced the spudding of Triceratops with HA115. That makes sense as pictures of that rig as I recall from mid April suggested it was ready to go. The question? Why the delay?
As far as when the new rig HA116 will arrive in PNG we know that will be late August.
Here's the link: http://www.haes.ca/category/news/
Posts: 1,670
Threads: 49
Joined: Jan 2012
Reputation:
91
'ArtM72' pid='61088' datel Wrote:From a mid June High Arctic press release: "High Arctic Rig 115 commences drilling first well Calgary, Canada – June 15, 2015 – High Arctic Energy Services Inc. (TSX: HWO) (“High Arctic” or the “Company&rdquo is pleased to advise that Rig 115 has started drilling operations in the Gulf Province of Papua New Guinea (“PNG&rdquo under the previously announced two year contract. Although the rig has been generating revenue since late March, the take-or-pay contract term commenced with the spudding of the first well on June 15, 2015. Tim Braun, High Arctic’s CEO, stated; “We are pleased to have Rig 115 operational in PNG, as this rig represents a significant increase to our service capabilities in the country. With the imminent deployment of Rig 116 from Houston, we anticipate the additional revenue generated from these rigs operating in PNG to significantly contribute to the profitability of the Company going forward.” Rig 116 has completed its refurbishment and upgrading in Houston, and is currently being prepared for shipment to Papua New Guinea. It is anticipated the rig will arrive into the country in late August, and once drilling commences it too will be operating under a previously announced two year term take-or-pay contract." So what we know from this is the "take or Pay" provision of HA's contract with IOC appears to have forced the spudding of Triceratops with HA115. That makes sense as pictures of that rig as I recall from mid April suggested it was ready to go. The question? Why the delay? As far as when the new rig HA116 will arrive in PNG we know that will be late August. Here's the link: http://www.haes.ca/category/news/
Art - Thanks for setting me straight on which HA rig was at Tri #3....#115. I believed it was HA #103 . If it is #116 that is coming in August,then do you know where the HA rig #103 is at the present time ? Is that the one that drilled Ant #5 ? Sorry if I got mixed up on my numbers...will try to keep up better on the next "go round". Have a good evening .
Posts: 8,568
Threads: 1,342
Joined: Dec 2011
Reputation:
380
PET posted this article earlier
IOC has two rigs under contract from High Arctic Energy Services.
Oil Search has had two heli-portable rigs (No. 103 and No. 104) contracted from High Arctic Energy Services. Rig No. 104 will remain under contract to Oil Search through 2014. Rig No. 103 is contracted for approximately 1 year to Interoil for drilling on “joint venture” lands. Reading between the lines it sounds like Rig No. 103 will be used to drill in PRL 15 where Oil Search is now one of the Joint Interest Owners.
Interoil’s joint venture lands are PPL 475 and PRL 39 with Pacific Rubiales Energy (PRE) and PRL 15 with Oil Search and Total.
High Arctic Energy Services has purchased two additional heli-portable rigs (No. 115 and No. 116). Interoil has signed a two year contract to use Rig No. 115 on its 100% owned properties. Interoil’s 100% owned properties are PPL 474, PPL 476 and PPL 477. (Of course the IPI partners are still involved with these properties)
High Arctic Energy Services also has the only heli-portable hydraulic workover rig available in PNG (Rig No. 102). This rig is presently not under contract. This rig might be useful in the future for re-completing all of the wells that IOC has drilled in Elk/Antelope to prepare them for production. It is my understanding that Total will be the operator of PRL 15 after FID so that work may be up to them.
High Arctic Energy Services also has snubbing equipment available if we have to work on any of our wells under pressure.
See http://www.haes.ca/invest-in-us/ and click on most recent presentation.
Posts: 2,623
Threads: 61
Joined: Dec 2011
Reputation:
225
07-29-2015, 09:07 AM
(This post was last modified: 07-29-2015, 09:22 AM by Getitrt2.)
vidon, again you are talking in generalities and not specifics. They "may not have kept the available rigs drilling", but you don't know "how many drilling rigs" they had. You admit you "may be ill informed", and appear to be just that. Given that, why would you not be doing research and asking questions and better informing yourself, before making ill-informed grandiose negative public claims as a shareholder (I assume), none of which are doing you or any of us any good, that "there has been plenty of time to develop the sites" (oh?), "certainly helicopter portable rigs are available in this downturn" (maybe in Texas, not in PNG), "somehow this does not look to me like great planning nor(sic) management", "they have not drilled as they said they would", and "their performance simply does not meet their own objectives ... consistently", all entirely preventable, of course. Finally, you close out with the erroneous, even laughable, statement that, "Our partner Total would be able to do more, particularly as they have assumed operator role per O'Neil puzzling situation ! ". Total was approved to be "operator" many months ago, and apparently are just now getting enough staff in country and have not actually taken over any operations yet. I don't know whether they are bringing in or taking over equipment, but they are taking over existing facilities and operations, not having to plan everything from scratch.
When this management team came in, they inherited two rigs with inadequate capability and efficiency, not obviously apparent at the time it seems, only one of which was heliportable and had ever even been used in PNG, did not have adequate financing, and had to focus on getting a monetization deal under very difficult circumstances. They had to find financing, staff up, and without sufficient equipment and seismic rush ahead with planning and implementing the spudding of three exploration wells in order to secure critical leases moving toward expiration, as well as plan and get started an appraisal program for E/A, starting with Ant 4, unlike anything ever before in the one-well-at-the-time history of the Company. Those inherited inadequacies prevented achieving desired objectives at all four of those first four wells, especially at Wahoo and Ant 4, where rigs had to be extensively upgraded (for the highest gas pressures ever encountered in PNG) or replaced, and which are now approaching completion. If I remember correctly, at one time management simultaneously had five wells in progress, either drilling or in temporary suspension. In the meantime, management has acquired a better High Arctic rig from OSH, which, along with expanded and upgraded staff, enabled the achievement of drilling objectives at Ant 5, and two newer High Arctic rigs from out-of-country exclusively for IOC, all heliportable, as described above, and has accomplished the most extensive seismic and airborne magnetic surveys ever over all the leases, which is on-going. The failure and replacement of the old rig from elsewhere at Ant 4 has apparently also delayed Ant 6 waiting for that rig, but all other current drilling is on track toward objectives as far as I know, with future plans as described above and in Company presentations. You should know about all that.
You say, "There has been plenty of time to develop the sites", implying they have been taking too long. How do you know? Have you ever been to one in PNG? They are all in the jungle with no road access, except for Wahoo, where they had to BUILD a road to the nearest one, for a rig not heliportable. They have to cut and grade the sites out of the jungle where it's high enough. They don't just pick up a rig by helicopter and fly it to a site, I don't believe, but have to break it down, fly the parts, and put it back together, and maintain it. Everything else has to be brought in in a similar manner, every person, including all outside service personnel for every function, grading equipment, mats, mud, pipe, every part, buildings, wood, food, every roll of toilet paper, everything. Weather is a frequent problem year-round, especially in the rainy season. That's all after they research and select the site. How long do you think it should take for each site, and how does that compare to how long it took? If you don't know all that, how can you make such judgments?
By the way, how much do you know about the time required to coordinate and get in outside service company personnel for testing and other functions, and government DPE inspectors, etc., in PNG?
As I said, THIS AIN'T TEXAS!
I would like to have seen things move faster, also. However, we all need to get the facts and be sure we know what we are talking about before we jump to conclusions and blow off in frustration about the stock, which is affected so much at this point by high levels of uncertainty, oil prices, and other exterior factors. While apparently not very widely understood yet, it appears that the bottom line results at the Company have been spectacular, "GIANT", so far!
Posts: 6,851
Threads: 697
Joined: Dec 2011
Reputation:
441
My guess is he doesn't have the time to do all of that research. Sometimes people just don't have the time, if they did they would, but they don't so they can't.
Posts: 2,623
Threads: 61
Joined: Dec 2011
Reputation:
225
'Palm' pid='61094' datel Wrote:My guess is he doesn't have the time to do all of that research. Sometimes people just don't have the time, if they did they would, but they don't so they can't.
You sure are a sarcastic so and so, aren't you? That's okay, I have no particular need for you to like me.
That is not his only option, as I indicated, among others. His to choose, his right.
Posts: 2,904
Threads: 58
Joined: Mar 2012
Reputation:
259
The fact remains IOC is way behind their own schedule of last year and don't seem to be moving very quickly at this time. That and their nonchalant attitude about investor interest in drilling progress tells us all this is a junior that shouldn't be on anyone's radar.
Maybe if Hession's first move wasn't to disband the construction division they'd have Bobcat 2 or Raptor 2 sites ready to drill. If that sounds too blue sky maybe they wouldn't have taken two months after the Triceratops rig set up to finally spud that well.
As for the weather in PNG it might be challenging but there aren't many hydrocarbon provinces where it's not.
|