Drilling
#61
Do the math on where cash will likely be after paying off those notes in Nov. Starts getting a bit thin.
Reply

#62
They have proved several times they know how to manage their cash. That said everyone should read page 19 and 20 from the Morgan Stanley June 18,2015 Talk with the CEO. Top of page 20 Hession states to be clear we are doing both in answer to a question from Evan Calio. Calio question was would they jump right to negotiations or appraise . Hession responded both and named Raptor. Bobcat and Triceratops as being further appraised and in negotiation for a new deal. Hession even gives you a time line... How hard is that to figure out???Using his estimated deal time if there is a willing party on the other side we get a new deal announced before we receive the Total payment .. Is this why Cohen bought 3 million shares???This information is public for all to see. Many fail to read these documents and that's a mistake.
Reply

#63
What is taking a4 so long to be drilled? To my understanding this is a small sidetrack.
Reply

#64
OSH said they would start the A4 side track in August.
Reply

#65

jft310 dateline='<a href="tel:1438551958">1438551958</a>' Wrote: They have proved several times they know how to manage their cash. That said everyone should read page 19 and 20 from the Morgan Stanley June 18,2015 Talk with the CEO. Top of page 20 Hession states to be clear we are doing both in answer to a question from Evan Calio. Calio question was would they jump right to negotiations or appraise . Hession responded both and named Raptor. Bobcat and Triceratops as being further appraised and in negotiation for a new deal. Hession even gives you a time line... How hard is that to figure out???Using his estimated deal time if there is a willing party on the other side we get a new deal announced before we receive the Total payment .. Is this why Cohen bought 3 million shares???This information is public for all to see. Many fail to read these documents and that's a mistake.

And many read these things and believe them lock stock and barrel. Hession said there would only be a deal done with Tri, or Wahoo IF they get at least the same terms as they got with Total in PRL 15. That's a huge IF especially with Wahoo. One well. Do you think they get a deal like they did with Total had they even done the first well at Ant where they just did Ant 5, the best well there? No way. Wahoo is a long way from EA and even a good result there will not get a deal done like what they have. There will need to be more deliniation done to be assured of the structure there.

Hope we would have learned that kind of thing by now. Even with a deal in PRL 15 it's taken quite a bit longer than originally planned. Wahoo should be expected to require much more to get the desired deal. Even Tri and Raptor/Bobcat. It's the way the industry works and it's not going to change just because of PRL 15. So we shouldn't expect it. If by small chance it does, well Hallelujah!  I'm not setting my expectation that high again.

Cohen bought because he got a great entry point for the PRL 15 happening. Made an offer to Chandler and it was accepted. Let's not project much of that toward Wahoo and Tri, etc.

Reply

#66
Actually the original the 2013 Press Release talked about a farm agreement with Total outside PRL15 . Further the Interoil slides show tie backs to PRL15 from Triceratops, Bobcat and Raptor .
Now Hession states he is in negotiations with someone not named to monetize TBR. Not hard to imagine a deal to make those tie backs a reality . The type of deal and when to be determined . Hession further states should take him 6 months to negotiate a deal which would put an announcement before we receive the Total money .
Reply

#67
Further the bases of design would need to include this tie back feature which Total would need to own a slice of . That's timed at 9 months from July.
Reply

#68
JFT, a question about the bases of design needing to include the tie back feature. Wouldn't that be needed only if the gas from Triceratops, Bobcat or Raptor were necessary for the initial trains?
Reply

#69
Exactly Thy, and IOC has been trumpeting that there is more than enough for 2-train startup. Hard for them to drive a deal with Total for tie-in when you say it isn't needed today.
Reply

#70

'jft310' pid='61247' datel Wrote:Sageo to me the interesting question is where will the new August delivered rig be deployed? would Antelope South be the priority or Antelope 7 ??? Will Total as operator bring in their own rigs ???if we provide the rig I assume we share costs if within PRL 15 ??? Which rig will drill Raptor ??? If the Wahoo sidetrack is a discovery do we drill a Wahoo 2 with that rig??? An update of the monetization efforts of our current discoveries would be nice triceratops, Bobcat and Raptor . Farm agreement ??? With Total ??or someone else ????

On the drilling, all questions I have already raised and/or commented on above, except for costs, and all costs in PRL 15 will be shared among the partners, of course.  If Ant 7 is drilled, it will get priority over Antelope South, as I indicated above.

Reply