12-27-2012, 06:32 AM
Tree,
As much as I respect what you say, your second point is incorrect. InterOil does not have a signed modified project agreement in hand. That has been part of the problem for the past six weeks. Phil talked about it, O’Neill wanted it, yet we are three days way from 2013 with nothing in writing.
As much as I respect what you say, your second point is incorrect. InterOil does not have a signed modified project agreement in hand. That has been part of the problem for the past six weeks. Phil talked about it, O’Neill wanted it, yet we are three days way from 2013 with nothing in writing.

