12-13-2013, 01:53 AM
'Palm' pid='34100' datel Wrote:Too much cost blow ups.
|
|
That is a $17.3 Billion blow up, and that blow up amount alone, is in the ball-park with cost to build PNG LNG and likely, the cost for proposed 8Mtpa IOC/TOT plant.
Too much cost blow-ups.

