What might be going on at Wahoo? Here is what we have been told:
From MD&A May 12, 2015
1. “PPL 474 - Wahoo drilling program - Wahoo-1 exploration well is about 170 kilometers southeast of our Elk and Antelope gas fields. On July 14, 2014, we announced that we had suspended drilling the Wahoo-1 well in PPL 474 after intersecting gas and higher-than expected pressures. The DPE approved this suspension to enable us to re-evaluate the drilling plan. - The mobilization of crew to site is currently ongoing, and we intend to resume drilling in the second quarter of 2015.”
2. “ Increase in cash outflows on exploration and development expenditures was mainly due to the site preparation and pre-spud costs for the Triceratops-3, Wahoo-1 Side Track and Antelope 6 well, and drilling costs incurred for the Antelope-4 and Antelope-5 wells.”
3. “Costs for site preparation and pre-spud work of the Wahoo side track well.”
From Presentation of May 12, 2015
1. “Wahoo and Triceratops-3 to drill mid-year”
Under Wahoo:
1. “Rig preparing side-track with new well design and larger blow-out preventer”
2. “Re-entering expected mid-year”
Comments:
You must understand that the following is speculation if it is not included in the above statements from the company.
So we know that the crew was being mobilized on May 12th (or earlier). That should not take more than a day or two since the Wahoo site is accessible by road. What is the crew doing? They must not just be idle.
1. They probably have dual down hole deployment valves in place in the 7” and 9 5/8” casing strings. The valves in the 7” are probably now closed..
2. The crew could be changing out the blow out preventer (BOP). They say they will be installing a “larger blow-out preventer”. I take that to mean they will have one or more additional sets of rams that are capable of closing off the annular part of the hole and a higher pressure rating than the old BOP. I had thought they might bring in a BOP that was capable of running a larger size casing but that would only be needed if they were starting a new well from the surface. Since they are side tracking the existing well that will not be needed on this well. It is still possible that they have that capability for use on future Wahoo wells.
3. Next they will need to circulate the old mud out of the hole, clean out the open hole to TD and plug the open hole with cement. We do not want to leave a path (open hole) for the formation to flow through as we drill the side track hole nearby.
4. We will then need to plug the bottom of the 7” liner.
5. Next we will need to recover the “tie-back” part of the 7” liner and plug the top of the remaining 7” liner.
6. I do not know if they intend to side track out of the 9 5/8” liner or the 13 3/8” casing. If they intend to side track from the 13 3/8’ casing they will need to recover the tie-back or upper part of the 9 5/8” liner and plug the top of the remaining 9 5/8” liner with cement.
7. After pulling the liners they will mill out about 40 feet of the casing where they intend to side track. That will be either the 9 5/8” or the 13 3/8”. In order to have more casing size options I think they will probably come all the way back to the 13 3/8” casing.
8 After milling out the window in the casing they will set a cement plug and probably a whipstock to allow the drill string to exit the old well through the 40 foot window. Then we will be off to drilling the new sidetrack well.
Since they have mobilized the crew I think they will announce at the AGM, or before, that work has commenced. They have said they would be commencing by mid-year but I think they will beat that target.
They have said “side track” and “re-enter” so it is clear that they will not be starting a new well from the surface. They have used the word "spud" which usually means to start a new well from the surface but in this case that is not what they mean.