How to monetize our gas??
#1

How to monetize our gas finds ??

The question starts with how much gas do we have to monetize.???

Per Interoil June 9 presention slide 27. Estimates from a certified reservoir evaluator.

Elk/Antelope a 2 train development without Antelope South

Wahoo 3.5 TCFE

Antelope South 5.5 TCFE

Raptor 5.5 TCFE

Bobcat 1.5 TCFE

Triceratops 1.0 TCFE

With 35 additional leads some multi TCFE

Or 17 TCFE identified plus Elk/Antelope plus leads.

Heres how Cheniere Energy monetized it's bought gas. 6 trains staggered start

Sabine Pass Liquefaction, LLC, a subsidiary of Cheniere Energy Partners, L.P. (Cheniere Partners), is developing natural gas liquefaction facilities at the Sabine Pass LNG receiving terminal located in Cameron Parish, Louisiana adjacent to the existing regasification facilities. The Sabine Pass site can readily accommodate up to six liquefaction trains capable of processing over 3.5 Bcf/d of natural gas. The production capacity of each LNG train is being designed for approximately 4.5 mtpa. The 1000+ acre Sabine Pass site is strategically situated to provide LNG export services given its large acreage position, proximity to unconventional gas plays in Louisiana and Texas, its interconnections with multiple interstate and intrastate pipeline systems, and its premier marine access less than 4 miles from the Gulf Coast. The trains are being developed in three stages, with stages including Trains 1&2, Trains 3&4 and Trains 5&6.

Cheniere estimates that construction of the liquefaction capacity is competitive due to expansion economics, since the Sabine Pass LNG terminal already has many of the facilities required for an export terminal. Sabine Pass Liquefaction will have access to the existing infrastructure, including five storage tanks and two berths at the Sabine Pass terminal, as well as Cheniere Partner’s 94-mile Creole Trail Pipeline, which is being reconfigured to reverse the flow of natural gas, making it a bi-directional pipeline

Construction commenced on Trains 1&2 in August 2012. Construction commenced on Trains 3&4 in May 2013. The first LNG train is expected to produce LNG in late 2015, with the remaining three LNG trains being completed on a 6-9 months staggered basis thereafter.

For the first four LNG trains, 16 of the 18 mtpa has been contracted to third party, foundation customers on a long-term FOB basis under sale and purchase agreements (SPAs). Foundation customers include BG Group, Gas Natural Fenosa, KOGAS and GAIL. Train 5 has been contracted with foundation customers Total and Centrica. Any excess capacity not sold under long-term SPAs to foundation customers is available for Cheniere Marketing to purchase as described under its SPA. Services under the SPAs include procuring the natural gas, liquefying the natural gas and loading LNG onto the customer’s vessels.

There are expected to be up to four pipelines directly connected to the terminal. Natural gas supply will be received from these pipelines that will be interconnected with interstate and intrastate pipelines upstream of the terminal. Cheniere Partners owns the Creole Trail pipeline, which is currently being reconfigured to reverse the flow of natural gas. Cheniere is securing capacity on the other main pipelines under long-term agreements. Natural gas supply is being purchased from producers and marketers on a short and long-term basis in order to balance the portfolio of natural gas feedstock.

Arun started with 3 LNG trains see below

Construction of the Arun LNG processing facilities, which initially consisted of 3 LNG trains, was set in motion in late 1974 by Bechtel Inc., as the main contractor. Mobil Oil Indonesia Inc., as Pertamina's production sharing contractor, discovered, developed and presently operates the Arun gas field which provides the entire feed stock for the Arun LNG plant.



Feed gas was first introduced into the plant in March 1978. Train 1 yielded its first drop of LNG in August 1978, train 2 in September 1978 and train 3 in February 1979. Condensate production commenced in May 1977. The Arun LNG processing plant is operated by PT Arun NGL Co., a non-profit operating company. PT Arun NGL Co. is owned by Pertamina (55%), Mobil Oil Indonesia Inc. (30%) and JILCO (Japan Indonesia LNG Co. - 15%), which represents the buyers.



In early 1981, the gas treating units of Trains 1, 2 and 3 were modified to increase the capacity to 115% of their original design of 1.7 million tons of LNG per train per year. In 1982, the Arun plant expansion program started with 2 additional trains (4 & 5). This expansion increased annual production capacity by an additional 3.4 million tons, all of which was exported to Japan. The expansion project was awarded to Chiyoda Chemical Engineering and Construction Co Ltd., in association with Mitsubishi Corporation and PT Purna Bina Indonesia.



Train 4 came on-stream in October 1983 and train 5 in January 1984. The expansion continued with train 6, engineered and constructed by JGC Corporation, and was on-stream in October 1986, one month ahead of schedule.



The contruction of the LPG facilities was started in February 1987. The project included extraction facilities in the Arun gas field and at the Arun LNG plant. Separate LPG storage and loading facilities located at the Arun LNG plant were also built. This project was awarded to JGC Corporation and was completed in October 1988. In order to fulfil targeted production assigned by the buyers, a capacity improvement project was initiated in 1990 and completed in 1993. Several pieces of LNG Trains equipment were modified and the plant capacity now reaching 138% of their original design capacity. These modifications increase the yield to more than 2 million tons of LNG per train per year.



To meet future demand, new gas fields will be integrated into the existing gas supply system. the South Lhoksukon gas field located 10 miles South inland of the Arun gas field will be online. Also, the Pase gas field which is located further south and the NSO gas field located 100 miles north east offshore of the Arun plant will be online before the year 2000.



The new gas fields will ensure adequate gas supply to meet contractual LNG demand until the year 2015.

Sabine Pass Liquefaction Aerial view

Reply



Messages In This Thread
How to monetize our gas?? - by jft310 - 06-30-2015, 04:37 AM
RE: How to monetize our gas?? - by jft310 - 07-03-2015, 01:35 AM

Forum Jump:


Users browsing this thread: