'Thylacine-2' pid='60092' datel Wrote:Phil's preference for a Gulf location, saving the pipeline cost, fit starting with a small low-cost modular plant. Had Somare stayed healthy we might have cash flow from LNG now. But for a big expensive two train plant with high probability of expansion trains.... Port Moresby.
Had IOC taken a SM partner as presented to Somare's Gov't in 2009 PA IOC would today be loading boats. The Gulf scheme was classic ends justifying the means and in retrospect financing that scheme would have surely been most difficult. I don't even want to contemplate the construction risk involved if IOC had been the Operator and was taking lead on construction in the Gulf. EeeGads. No wonder Duma threatened to yank IOC's PA. Phil lead a Gulf goose chase and is what lead to internal strife between management and Phil and BoD and Phil and Phil got muscled out. We are back to 2009 and TOT will announce then build this plant near PNG LNG. We go 'xploring and selling in the meantime.