07-03-2015, 01:35 AM
Industry norm is a relative term , there are few places in the world with such a large concentrated gas asset . The question is what is the norm for assets with this size asset???Not a non related question of what the average LNG project starts with , if they had our assets as an average would they start with more than 2 trains ??
Arun started with 3 trains at 3.5 mtpa later expanded to 4.5 mtpa and then 3 more trains were added. Why look at Arun because that's the reference GLJ used for describing Antelope . When sizing one must include what's at Antelope South . Per a certified Reservoir engineer expect 5.5 T's. Add that number to Antelope because that gas gets developed with Antelope gas .
Further look at Cheniere Energy who started with 2 trains and staggered started 2 more trains less than a year later .
Arun started with 3 trains at 3.5 mtpa later expanded to 4.5 mtpa and then 3 more trains were added. Why look at Arun because that's the reference GLJ used for describing Antelope . When sizing one must include what's at Antelope South . Per a certified Reservoir engineer expect 5.5 T's. Add that number to Antelope because that gas gets developed with Antelope gas .
Further look at Cheniere Energy who started with 2 trains and staggered started 2 more trains less than a year later .