Posts: 4,164
Threads: 1,500
Joined: Dec 2011
Reputation:
268
Oil Search in resource drive
28 August 2015
Papua New Guinea’s dominant operator Oil Search is targeting between 6 trillion cubic feet and 7 Tcf of gas with its upcoming exploration drive, designed for the most part to firm up new liquefied natural gas volumes.
The company repeated its recent comments that it plans to drill at least 12 exploration and appraisal wells in the next 18 months.
Two appraisal wells on the Elk-Antelope fields will close out 2015, and at least 10 wells are planned for next year, with drilling focused on three distinct areas.
The first is in the north-west Highlands near the major fields that underpin the PNG LNG project, the second is the Gulf Province area near the Elk-Antelope fields, and the third is the Forelands area, which Talisman Energy, Horizon Oil and partners have energised in recent years.
In the Highlands, the Muruk-1 well in Block PPL 402 is on trend with the Hides field.
It is a potential multi-Tcf structure and high-impact well in a core area for PNG LNG expansion, said Oil Search.
Two wells are planned in Block PPL 269, operated by Repsol (Talisman). The Strickland-1 well is located west of the Juha field, and will spud in late 2015.
In Gulf Province, the Antelope South exploration well is planned next year, along with Kalangar-1 in Block PPL 339.
In the Forelands, remapping of several older accumulations — Kimu, Barikewa and Uramu — has upgraded their resource potential and each will have appraisals drilled on them.
Posts: 12,025
Threads: 1,809
Joined: Apr 2008
Reputation:
227
Thanks. Apparently not everybody is going slow with exploration..
Posts: 2,623
Threads: 61
Joined: Dec 2011
Reputation:
225
It looks to me like it's mostly appraisal wells and exploration wells drilled by others that OSH has an interest in, including Antelope South and Repsol wells.
Posts: 2,904
Threads: 58
Joined: Mar 2012
Reputation:
259
12 wells in a year and a half. Hmm...OSH seems to be able to multitask. Hope there will be land crews enough to clear some pads so IOC can do a little work.
Not griping here, only appreciating the perspective on the speed with which IOC has been doing appraisals.
Posts: 12,025
Threads: 1,809
Joined: Apr 2008
Reputation:
227
'ArtM72' pid='62326' datel Wrote:12 wells in a year and a half. Hmm...OSH seems to be able to multitask. Hope there will be land crews enough to clear some pads so IOC can do a little work. Not griping here, only appreciating the perspective on the speed with which IOC has been doing appraisals.
It's not an entirely fair comparation, Art. OilSearch generates considerable cash flow from operations, they're bigger by quite some margin.
There were times when IOC was drilling one well at a time..
Anyway, the oil reversal and Ant4 drilling is just what the doctor ordered.
Posts: 2,623
Threads: 61
Joined: Dec 2011
Reputation:
225
09-01-2015, 06:23 AM
(This post was last modified: 09-01-2015, 06:30 AM by Getitrt2.)
Good points, admin, and IOC had very limited rig capabilities until recently, with further increase pending. Also, it's not 12 OSH wells, as I indicated, but rather includes IOC/Total and Repsol/Talisman wells OSH simply has an interest in, a ridiculous comparison, and we don't know how many wells IOC might be involved in in the next 18 months, starting with Ant 4 and Triceratops 3 still being tested.
IOC had one bad appraisal drilling performance with a bad rig it had no alternative to, and a great performance at Ant 5 with a good rig now being used at Ant 4 sidetrack and Ant 6.
Posts: 2,904
Threads: 58
Joined: Mar 2012
Reputation:
259
09-01-2015, 03:00 PM
(This post was last modified: 09-01-2015, 03:03 PM by ArtM72.)
(09-01-2015, 06:23 AM)Getitrt2 Wrote: Good points, admin, and IOC had very limited rig capabilities until recently, with further increase pending. Also, it's not 12 OSH wells, as I indicated, but rather includes IOC/Total and Repsol/Talisman wells OSH simply has an interest in, a ridiculous comparison, and we don't know how many wells IOC might be involved in in the next 18 months, starting with Ant 4 and Triceratops 3 still being tested. IOC had one bad appraisal drilling performance with a bad rig it had no alternative to, and a great performance at Ant 5 with a good rig now being used at Ant 4 sidetrack and Ant 6.
Getit - My comments were really more focused on IOC's properties outside PRL15 although Antelope South has been sitting waiting to be drilled. I will remind everyone that at the June 2014 AGM the graphics showed a possible spudding of AS1 1Q2015. Hard to imagine finding more gas wasn't a priority a year ago when there was little assurance E/A had enough gas for two trains. Yet 1Q2016 is even starting to appear to be a wet dream. Yeah, I know, IOC no longer controls the schedule...but the point remains.
Re IOC properties, we don't know what Rig 3 is doing other than gathering rust. Bobcat 2? How long has Raptor 1 been sitting getting ready for its sidetrack? I trust Triceratops 3 will be giving us...er...Hession... data very soon but the 2014 AGM spud date for T3 was 4Q2014. We're not yet finished. Oh yeah, the rigs have been breaking down. That's why IOC didn't spud Triceratops until more than 3 months after the High Arctic crew took it "mission accomplished" shot in front of their rig? That's why 116 is sitting idle now?
Maybe the best thing to do IS to give Hession his $30 million, walking papers and a nice letter of recommendation for a job well done. Trouble is, he stacked the Board with his buddies.
Posts: 8,568
Threads: 1,342
Joined: Dec 2011
Reputation:
380
Two things , Interoil has had a minority vote since Dec 2013 on activities inside PRL-15. Interoil has access to a loan but so far at least prefers to not use the loan . Interoil is not cash rich . So the voting interest minority and cash position can and do impact what happens . Of course they could have issued equity and diluted shareholders like Phil did . Not the best of choices either .
Posts: 2,623
Threads: 61
Joined: Dec 2011
Reputation:
225
'ArtM72' pid='62340' datel Wrote:
'Getitrt2' pid='62329' datel Wrote:Good points, admin, and IOC had very limited rig capabilities until recently, with further increase pending. Also, it's not 12 OSH wells, as I indicated, but rather includes IOC/Total and Repsol/Talisman wells OSH simply has an interest in, a ridiculous comparison, and we don't know how many wells IOC might be involved in in the next 18 months, starting with Ant 4 and Triceratops 3 still being tested. IOC had one bad appraisal drilling performance with a bad rig it had no alternative to, and a great performance at Ant 5 with a good rig now being used at Ant 4 sidetrack and Ant 6.
Getit - My comments were really more focused on IOC's properties outside PRL15 although Antelope South has been sitting waiting to be drilled. I will remind everyone that at the June 2014 AGM the graphics showed a possible spudding of AS1 1Q2015. Hard to imagine finding more gas wasn't a priority a year ago when there was little assurance E/A had enough gas for two trains. Yet 1Q2016 is even starting to appear to be a wet dream. Yeah, I know, IOC no longer controls the schedule...but the point remains.
Re IOC properties, we don't know what Rig 3 is doing other than gathering rust. Bobcat 2? How long has Raptor 1 been sitting getting ready for its sidetrack? I trust Triceratops 3 will be giving us...er...Hession... data very soon but the 2014 AGM spud date for T3 was 4Q2014. We're not yet finished. Oh yeah, the rigs have been breaking down. That's why IOC didn't spud Triceratops until more than 3 months after the High Arctic crew took it "mission accomplished" shot in front of their rig? That's why 116 is sitting idle now?
Maybe the best thing to do IS to give Hession his $30 million, walking papers and a nice letter of recommendation for a job well done. Trouble is, he stacked the Board with his buddies.
Art, I understand your frustration with some things that have happened with the Company and the markets, but I sure don't understand some of the things you're saying. Why would you accuse them of considering "finding more gas not a priority a year ago" because Antelope South is not drilling yet? That makes no sense. That earlier "possibility" (not commitment) changed because of several totally legitimate reasons. It was very properly a lower priority than all the E/A appraisal wells, for which they did not have sufficiently capable rigs at that point, which could not be changed right away. As a result, they had to try to drill Ant 4 with a rig that proved to be almost totally inadequate, which they finally managed to almost complete it with but eventually had to be scrapped now that they have additional much better ones; and that delayed almost everything, especially in PRL 15. However, the well results were so good that they are using Rig 103 from Ant 5 to drill an extensive side track to the south, an apparently very worthwhile further delay. Then the JV decided to drill an Ant 6 not definitely on the agenda at the time of the 2014 AGM listing AS as a "possibility" in early 2015. Do you consider that a mistaken priority over AS? Then, because of the fantastic results and information obtained from Ant 5, which properly got rig priority over Ant 4 and was drilled extremely efficiently, thankfully, the JV has been considering an Ant 7. If the JV decides that should be drilled to complete the E/A appraisal, do you not agree that should get priority over Ant South? The appraisal done so far has already provided a great deal of "assurance" of enough gas for two trains in E/A without Ant South, which is therefore not needed for that and should alleviate your apparent concern about that. If they do drill Ant 7, I believe Rig 116 would be the only appropriate rig available for that and need to go to that as the priority, or perhaps to Ant South otherwise. Disagree? Therefore, it is not just "sitting idle" as it is processed through customs and approved/licensed by the PNG government and prepared for Ant 7 or Ant South or whatever after a JV decision.
The Raptor side track could not be spudded until Rig 115 was finished at Tri 3 and mobilized to and set up at Raptor. If you want to know why Tri 3 was not spudded sooner with Rig 115, perhaps you should inquire of Lynn at IR, before assuming and claiming there was no good reason.
Rig 3 is not heliportable and therefore severely restricted in its use, assuming they decide it should be used again at all. My impression is that if so it would be used again at a PRL 474 site reasonably accessible by road. That requires further evaluation after the results at Wahoo, with I think properly lower priority than appraisal wells at PRL 15 and elsewhere, but which I think is getting some attention. Disagree? I don't know whether Rig 2 at Bobcat will be used again.
Frankly, I think speculation about firing Hession at this point is unjustified as far as what I know, even absurd, and harmful to all of us. Thanks for your attention and consideration, and I would be interested in any further information you find.
Posts: 254
Threads: 36
Joined: May 2015
Reputation:
29
Frankly Getit I think we agree here. It is way to early for a dismissal in regard to Mr. M Hession's employment with the company. He has stopped much of the gossip mill that infiltrated the company in the previous regime. He made a great move in selling the refinery and gas stations. He has completed a deal and whether it is the transformational deal remains to be determined, but really the whole deal will not completely play out for 8-10 years. You see if the company remains in business and is receiving a billion per year from Elk Antelope gas the stock price should follow. Then there is all the rest of the opportunities in Raptor, Bobcat, Triceratops and other locations. The oil rout has just about finished in the opinion of many experts and past historical charts shows it will turn up very soon. So in our Millennial World where we want instant gratification (i get impatient and whiny too) the Hession management team has a ways to go before the ax man should be summoned. September 30, 2016 our certification payment and then a year later our FEED payment is only one of several future steps for the company. Stuff good and problematic will happen in the next 12 months but much of the story will be known in a year. Not long in the investing world. If I would have held many of my former stocks and been patient I would be smiling even today with the downturn. Patience and the long term typically wins with quality. We know the gas is there. There is enough for two trains , Hession said so. We will be rewarded. Damn its hard to sit around and wait.
|